contains
Contract No. 60, Access Roads to Shaft 12, Quabbin Aqueduct, Hardwick and Greenwich, left slope, showing storm damage, looking ahead from Sta. 20+00, Greenwich and Hardwick, Mass., Sep. 28, 1938
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, well point system used for water supply, Southborough, Mass., Aug. 22, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, pipe yard for 12 and a half foot diameter pipe sections, looking southeast, Southborough, Mass., Aug. 22, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, #6 northwest crane, pipe forms, base rings, and reinforcing cylinder, looking south, Southborough, Mass., Aug. 22, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, cracks in 7 foot pipe section developed under 375 lbs./sq. in. pressure, picture taken after test was finished, looking southeast, Natick, Mass., Aug. 11, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, cracks in 7 foot pipe section developed under 375 lbs./sq. in. pressure, picture taken after test was finished, looking east, Natick, Mass., Aug. 11, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, cracks in 7 foot pipe section developed under 325 lbs./sq. in pressure, 3:15 PM, looking southeast at horizontal axis, Natick, Mass., Aug. 11, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, leak at vertical axis in 7 foot pipe section developed under 375 lbs./sq. in. pressure, 3:22 pm, looking south, Natick, Mass., Aug. 11, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, 7 ft. pipe section (with 4 degree 30 foot vertical bevel) ready for strength test, looking east at 45 degree angle from vertical axis, Natick, Mass., Aug. 11, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, hole in steel cylinder of pipe section about on vertical axis, failure at 375 lbs./sq. in. in pressure, Natick, Mass., Aug. 11, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, entrance to Lock Joint Pipe Co. Plant, looking east from Chestnut Hill Road, Southborough, Mass., Aug. 22, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, apremeter, loading truck, looking north, Southborough, Mass., Aug. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, Generazio Sand and Gravel Plant (supplying Lock Joint Pipe Co.), looking west, Framingham, Mass., Aug. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, 1 cubic yard concrete mixer pouring concrete into pipe forms, Southborough, Mass., Aug. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, cement hopper, scale, Southborough, Mass., Aug. 22, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, #6 northwest crane unloading cylinder and reinforcement ready for concrete, Southborough, Mass., Aug. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, Generazio Sand and Gravel Plant, supplying Lock Joint Pipe Co., looking south west, near Saxonville, Framingham, Mass., Aug. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, steam plant (1 horizontal and 1 vertical boiler) supplying steam to heat pipe, Southborough, Mass., Oct. 27, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, Generazio Sand and Gravel Plant, supplying Lock Joint Pipe Co., looking southeast, Framingham, Mass., Aug. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, Generazio Sand and Gravel Plant, supplying Lock Joint Pipe Co., looking north, Framingham, Mass., Aug. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, "A" frame gantry for turning pipe sections, Southborough, Mass., Aug. 22, 1939
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back towards Sta. 131+00, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 203+35, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 194+80, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 155+50, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 203+35, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 151+50, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking southerly from Shaft 11A access road, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 160+50, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 195+75, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, plant at Shaft 10, Quabbin westerly, Quabbin Aqueduct, Hardwick, Mass., May 24, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, looking east at Sta. 1314+94 showing forms for circular section, Quabbin Aqueduct, Hardwick, Mass., May 22, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, looking east at screen at Sta. 838+00, east heading of Shaft 9, Quabbin Aqueduct, Barre, Mass., Jan. 2, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, vent hole between Shafts 11 and 12, showing 6 in. casing before making joint, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, rock formation, north side of arch at Sta. 1019+50, west heading of Shaft 10, Quabbin Aqueduct, Hardwick, Mass., Oct. 15, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, view of cut and shaft at Shaft 11A, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, interior of chlorinator house at the bottom of Shaft 9, Quabbin Aqueduct, Barre, Mass., Jan. 2, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, crusher and screening plant at Shaft 10, Quabbin Aqueduct, Hardwick, Mass., Nov. 28, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, washing and mixer plants at Shaft 9, Quabbin Aqueduct, Barre, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, dragline at Shaft 10, Quabbin Aqueduct, Hardwick, Mass., Nov. 28, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, incline on rig, east heading of Shaft 10, Quabbin Aqueduct, Hardwick, Mass., May 24, 1934
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking easterly at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeast from Sta. 7+50, east branch baffle, Hardwick, Mass., May 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking west at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, paving on west slope near Sta. 28+00, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking upstream from bridge at Sta. 10+00, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 50+40, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, Shaft 11A and outlet channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking southwesterly at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, bridge site, Sta. 10+00, looking south, middle-east channel, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 70, WPA Sewer Construction, Rutland, "A" line, Main Street, looking back from Sta. 7+15 towards manhole 2A, Rutland Sewer, Rutland, Mass., Jan. 9, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from Sta. 7+15 towards manhole 3A, Rutland Sewer, Rutland, Mass., Jan. 9, 1941
contains
Contract No. 71, WPA Sewer Construction, Holden, commission property at Parker's Pond, Holden, used as pipe and sand storage, looking southerly from Main Street, Holden Sewer, Holden, Mass., Dec. 5, 1939
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from manhole 7A, Rutland Sewer, Rutland, Mass., May 23, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, Main Street, Rutland, looking ahead from manhole 6, Rutland Sewer, Rutland, Mass., May 23, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from manhole 6A, Rutland Sewer, Rutland, Mass., May 23, 1941
contains
Contract No. 56, Administration Buildings, Main Dam, Belchertown, deepwell pump and airplane gasoline pump, machine shop, patrol building, Belchertown, Mass., Sep. 14, 1938
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 151+50, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 127+50, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 201+00, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking westerly at Sta. 0+25, Blue Meadow Road, Belchertown, Mass., Jun. 14, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 5+00, Blue Meadow Road, Belchertown, Mass., Jun. 14, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 5+00, Blue Meadow Road, Belchertown, Mass., Jun. 14, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 203+35, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 185+85, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 198+75, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 195+75, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 193+20, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 199+75, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 158+50, East Branch access road, Belchertown, Mass., Jun. 9, 1941
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking westerly at Sta. 0+25, Blue Meadow Road, Belchertown, Mass., Sep. 19, 1945
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 4+00, Blue Meadow Road, Belchertown, Mass., Sep. 19, 1945
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 178+65, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 189+65, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 203+35, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 136+90, East Branch access road, Belchertown, Mass., Jun. 9, 1941
contains
Contract No. 108, Utility Wharves, Quabbin Reservoir, Ware, panorama of anchorage basin, looking northerly from Sta. 0+00, 50 feet left, Ware, Mass., Sep. 18, 1940
contains
Contract No. 108, Utility Wharves, Quabbin Reservoir, Ware, panorama of anchorage basin, looking westerly from Sta. 0+00, 50 feet left, Ware, Mass., Sep. 18, 1940
contains
Contract No. 108, Utility Wharves, Quabbin Reservoir, Ware, panorama of anchorage basin, looking northwesterly from Sta. 0+00, 50 feet left, Ware, Mass., Sep. 18, 1940
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1253+00, east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Apr. 21, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, unloading cement from truck at Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, ruins of crusher plant at Shaft 11 destroyed by fire Jan. 2, 1934, Quabbin Aqueduct, Hardwick, Mass., Jan. 5, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, measuring weir and screen at Shaft 9, weir at Sta. 844+80, looking west in west heading, Quabbin Aqueduct, Barre, Mass., Jan. 2, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, vent hole casing at Sta. 1228+31, Quabbin Aqueduct, Hardwick, Mass., Dec. 7, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 792+90, east heading of Shaft 9, Coldbrook-Swift Tunnel, Barre, Mass., Jan. 25, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, holing through, east heading, Shafts 9 to 8, at Sta. 769+99, looking east, Barre, Mass., Jan. 25, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, interior of chlorinator house at the bottom of Shaft 9, Quabbin Aqueduct, Barre, Mass., Jan. 2, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, progress panorama of Shaft 9, looking southeasterly, Coldbrook-Swift Tunnel, Barre, Mass., Jan. 25, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, concrete gun at Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, bottom of Shaft 9, chlorinator house in background, Quabbin Aqueduct, Barre, Mass., Jan. 2, 1934
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, site of east branch baffle, looking northwest from Sta. 13+00, Hardwick, Mass., Jun. 25, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking south at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeast along center line from Sta. 7+60, east branch baffle, Hardwick, Mass., Aug. 7, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, general view of culvert and baffle site, looking north, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 14+00, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 45, middle-east channel, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from near Sta. 56+50, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking west at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking east at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from manhole 6A, Rutland Sewer, Rutland, Mass., Feb. 26, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from opposite manhole 3A, Rutland Sewer, Rutland, Mass., Feb. 26, 1941
contains
Contract No. 109, Radio System Installation, Ware, Belchertown, Pelham, Barre, Clinton, Southborough, looking northeasterly at base of radio mast, showing transmission line and trestle, Wachusett Reservoir, Clinton, Mass., Jan. 8, 1941
contains
Contract No. 109, Radio System Installation, Ware, Belchertown, Pelham, Barre, Clinton, Southborough, radio transmitter and receiver in service building at Shaft 8, Barre, Mass., May 16, 1941
contains
Contract No. 109, Radio System Installation, Ware, Belchertown, Pelham, Barre, Clinton, Southborough, looking northeasterly at radio mast at Shaft 8, Barre, Mass., Jan. 8, 1941
contains
Contract No. 109, Radio System Installation, Ware, Belchertown, Pelham, Barre, Clinton, Southborough, looking northerly at radio mast at Shaft 8, Barre, Mass., Jan. 8, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking southwest at traffic circle showing loam placement as done by Contract 84, headhouse at Shaft 4, Southborough, Mass., May 6, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking easterly showing spoil being levelled off, headhouse at Shaft 4, Southborough, Mass., May 6, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking northerly showing loam piles and the placing of fill, headhouse at Shaft 4, Southborough, Mass., May 6, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking westerly showing spoil pile and general operations, headhouse at Shaft 4, Southborough, Mass., May 6, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking southwesterly from 53+00 showing fill in low spot in access road, Section 1, Southborough, Mass., May 6, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking westerly from Station 73+00 showing placement of fill on Section 1 access road, access road, Section 1, Southborough, Mass., May 6, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking westerly showing excavation of tunnel muck pile and general conditions of area, headhouse at Shaft 4, Southborough, Mass., May 6, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, view showing rolling operation on sub grade for traffic circle and building approach, headhouse at Shaft 4, Southborough, Mass., May 15, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking westerly from Sta. 77+50 showing road, grading operations on access road, Section 1, Southborough, Mass., May 6, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking westerly from Station 64+50 showing Section 1 access road previous to work by Contract 130, access road, Section 1, Southborough, Mass., May 6, 1941
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 4, Sta. 292+80, Rutland, Mass., Aug. 27, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 2 west, Sta.168+5, Holden, Mass., Aug. 9, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, panorama picture 3, Shaft 2, Holden, Mass., Jul. 29, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, spoil bank surface, Shaft 1, West Boylston, Mass., Sep. 30, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, contractors buildings, Shaft 1, West Boylston, Mass., Sep. 30, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, timbering at tunnel, Shaft 4, Rutland, Mass., Apr. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, tunnel at Shaft 2, Holden, Mass., Apr. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, west end of form, Shaft 1, West Boylston, Mass., Jul. 29, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, panorama picture 1, Shaft 2, Holden, Mass., Jul. 29, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 4, Sta. 291+50, Rutland, Mass., Aug. 27, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, heading through Shaft 2 to 3, Holden, Mass., Mar. 11, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, contractors buildings, Shaft 4, Rutland, Mass., Sep. 30, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, spoil bank, Shaft 1, West Boylston, Mass., Sep. 30, 1929
contains
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, general view of construction, from Boston and Albany Railroad, Shaft 8, Barre, Mass., Sep. 17, 1929
contains
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Venturi meter recorders and operating panel, intake building, Shaft 8, Barre, Mass., Aug. 31, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, location of spoil bank, Shaft 9, looking northwest, Barre, Mass., Jul. 10, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, mucking machine, Shaft 12, front view, Hardwick, Mass., Jan. 9, 1932
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, end view showing wire reinforcing cage being wound on steel cylinder, Natick, Mass., Nov. 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, showing welding of joint rings to cylinder, Natick, Mass., Nov. 10, 1939
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 185+85, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 185+85, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 125+75, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 199+25, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 161+25, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 117+00, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 152+00, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 144+00, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 172+00, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, temporary timbering, Sta. 876+56 to 876+82, looking east, west heading, Shaft 9, Coldbrook-Swift Tunnel, Barre, Mass., Feb. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, unloading cement at Old Furnace, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, gunite lining at Sta. 811+76, east heading, Shaft 9, Coldbrook-Swift Tunnel, Barre, Mass., Feb. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, permanent timbering at Sta. 807+00 to 807+59, looking west, east heading, Shaft 9, Coldbrook-Swift Tunnel, Barre, Mass., Feb. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1289+00, east heading, Shaft 12, Coldbrook-Swift Tunnel, Hardwick, Mass., Oct. 4, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 777+00, east heading of Shaft 9, Coldbrook-Swift Tunnel, Barre, Mass., Jan. 25, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 797+60, east heading of Shaft 9, Coldbrook-Swift Tunnel, Barre, Mass., Jan. 25, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, lagoon and settling basin at Shaft 9, Quabbin Aqueduct, Barre, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, progress panorama of Shaft 9, looking westerly, Coldbrook-Swift Tunnel, Barre, Mass., Jan. 25, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, loading train at Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, head frame and works, Shaft 10, Hardwick, Mass., Mar. 5, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, lower intake and tube, Shaft 12, Hardwick, Mass., Sep. 9, 1932
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, excavation for 12 in. pipe, looking westerly at Sta. 142+75, Rutland-Holden Sewer, Holden, Mass., Apr. 27, 1934
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, right bank, Sta. 1+34, rock flour deposit at depth of 20 feet, shovel cut "F", dike borrow area no. 6C, Belchertown, Mass., Oct. 5, 1934
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking down channel along center line from Sta. 10+00 at road, middle-east channel, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, general view from Sta. -0+20, dike borrow area no. 7, shovel cut "G", Belchertown, Mass., Sep. 10, 1934
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, ledge outcrop near road to old Greenwich Railroad Station, looking northeast, Hardwick, Mass., Apr. 21, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, ledge outcrop near road to old Greenwich Railroad Station, looking northerly, Hardwick, Mass., Apr. 21, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking easterly from near highway intersection, east branch baffle, Hardwick, Mass., Jan. 5, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking easterly at main quarry, east branch baffle, Hardwick, Mass., Apr. 21, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, ledge outcrop near road to old Greenwich Railroad Station, looking northwesterly, Hardwick, Mass., Apr. 21, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, ledge outcrop on road to old Greenwich Station, looking northwest, Hardwick, Mass., Apr. 21, 1937
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 1, kitchen, high level distribution reservoir, Weston, Mass., Jul. 19, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, pond at outlet end of drain, near high level distribution reservoir, looking east, high level distribution reservoir, Weston, Mass., Jun. 23, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 2, kitchen, high level distribution reservoir, Weston, Mass., Jul. 19, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 9, library, high level distribution reservoir, Weston, Mass., Jul. 19, 1939
contains
Contract No. 71, WPA Sewer Construction, Holden, looking westerly at pump chamber, foundation and form work for 18 in. floor, pumping station site, Holden Sewer, Holden, Mass., Sep. 15, 1942
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from inside of gate on East Branch access road, Belchertown, Mass., Sep. 10, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 134+60, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 142+00, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 147+20, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 144, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from entrance of East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 151+50, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 161+25, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 172+50, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 166+75, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 158+50, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 172+50, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 151+50, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 107, Quabbin Hill Recreation Buildings and Road, Ware, looking southwesterly at utility building and tower, showing radio mast, sixth floor observatory, parking area on east side, Ware, Mass., Feb. 10, 1941
contains
Contract No. 107, Quabbin Hill Recreation Buildings and Road, Ware, looking southerly at tower and utility building, showing entrance to tower, sixth floor observatory, and radio mast, Ware, Mass., Feb. 10, 1941
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, contractors buildings, Shaft 9, Barre, Mass., Aug. 7, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, lower intake channel, Shaft 12, looking east, Hardwick, Mass., Nov. 25, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, mucking machine, Shaft 12, rear view, Hardwick, Mass., Jan. 9, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, drill carriage, side view, Shaft 10, Hardwick, Mass., Mar. 5, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1303+30, east heading, Shaft 12, Coldbrook-Swift Tunnel, Hardwick, Mass., Oct. 4, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, drill carriage, front view, Shaft 10, Hardwick, Mass., Mar. 5, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, intake structure, precast rack bars being placed, Shaft 12, Hardwick, Mass., Sep. 24, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, mucking machine in operation test, Shaft 12, rear view, Hardwick, Mass., Jan. 9, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, approach channel after diverting river, stream control works, looking upstream, Belchertown, Mass., Jun. 8, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, piers at foot of shaft, diversion tunnel, looking upstream, Belchertown, Mass., Feb. 5, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, approach channel of diversion tunnel, Belchertown, Mass., Jul. 11, 1932
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, laying 16 in. pipe, looking northwest near Sta. 452, Rutland-Holden Sewer, Holden, Mass., Apr. 27, 1934
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, looking back from near Sta. 475+92, Ostebo house in left foreground, Rutland-Holden Sewer, Rutland, Mass., Sep. 6, 1934
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Worcester Brook culvert, looking northerly, Rutland-Holden Sewer, Holden, Mass., Oct. 10, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Eagle Lake culvert, looking easterly along center line, Rutland-Holden Sewer, Holden, Mass., Oct. 10, 1933
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Eagle Lake culvert, looking northerly, Rutland-Holden Sewer, Holden, Mass., Oct. 10, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, approach channel after diverting river, looking towards portal, stream control works, Belchertown, Mass., Jun. 8, 1933
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, borrow pit, west of manhole 103 looking north, Rutland-Holden Sewer, Holden, Mass., Oct. 10, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, intake portal of diversion tunnel showing falsework, Belchertown, Mass., Sep. 8, 1932
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, ledge outcrop on road to old Greenwich Railroad Station, looking northerly, Hardwick, Mass., Apr. 21, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, large quarry, showing 2 feet overburden, looking northeasterly, Hardwick, Mass., Jun. 3, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, large quarry, showing 6 feet overburden, looking easterly, Hardwick, Mass., Jun. 3, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, quarry site, showing approximate flow line, Hardwick, Mass., Jun. 21, 1937
contains
Contract No. 108, Utility Wharves, Quabbin Reservoir, Ware, looking westerly from end of turning space, showing guard rail, retaining wall, trap rock surfacing, Ware, Mass., Dec. 10, 1940
contains
Contract No. 108, Utility Wharves, Quabbin Reservoir, Ware, 40 ft. by 16 ft. timber float showing gang plank, barrels in place, looking northerly, Ware, Mass., Dec. 9, 1940
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, headframe at Shaft 4, Rutland, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Parcel F, property of Chadzynski near Shaft 2, Holden, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, filter beds at Shaft 2, Holden, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, water in east tunnel at Shaft 2, Holden, Mass., Dec. 17, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, pumping station at Shaft 2, Holden, Mass., Dec. 17, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, mucking machine, west tunnel, Shaft 2, Holden, Mass., Dec. 19, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, changing battery in tunnel at Shaft 2, Holden, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, mucking machine, east tunnel, Shaft 2, Holden, Mass., Dec. 17, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 21, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 21, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 21, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 594+65, Shaft 7 east, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 485+35, Shaft 6 east, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, aggregate piles and crusher from muck pile, Shaft 2, Holden, Mass., Dec. 1, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, heading and mucking machine, Shaft 7 east, Sta. 581+90, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 21, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Apr. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, Rutland, Mass., Nov. 21, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Nov. 14, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, results of fire in compressor room, Mar. 3, 1931, at Shaft 7, looking northeast, Rutland, Mass., Mar. 11, 1931
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 724+48 on the north and Sta. 724+50 on the south wall, west of the Ware River Intake, Barre, Mass., Oct. 7, 1937
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking westerly at broken section at bottom of Shaft 6, Rutland, Mass., Dec. 8, 1938
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, dumping concrete from train on graded invert, Sta. 378+00, Shaft 5, Rutland, Mass., Nov. 4, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, finished tunnel showing invert, side walls and arch, Sta. 373+00, Shaft 5, Rutland, Mass., Nov. 4, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete mixer and gun, Shaft 6, Sta. 497+80+/-, Rutland, Mass., May 6, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, bulkhead in tunnel west of Shaft 8, east side, Sta. 742+02, Barre, Mass., Jan. 12, 1931
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, dismantling shaft head works at Shaft 7, Rutland, Mass., Mar. 11, 1931
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 724+70 on the north and Sta. 724+71 on the south wall, west of the Ware River Intake, Barre, Mass., Oct. 7, 1937
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, view showing crimping machine, bell and spigot ring fabrication plant, Natick, Mass., Nov. 10, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, showing crane and bucket filling hopper for placing of concrete for pipe, Natick, Mass., Nov. 10, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, view showing ring stretching, bell and spigot ring fabrication plant, Natick, Mass., Nov. 10, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, view of Lock Joint and MDWSC engineers' offices at Pipe Plant, Natick, Mass., Nov. 10, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, showing hydraulic test stand with cylinder partially on stand, Natick, Mass., Nov. 10, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, hydraulic test stand, east side, Natick, Mass., Nov. 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, view showing plate carriage and cylinder rolling machine, Natick, Mass., Nov. 10, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, showing cylinder welding table, Natick, Mass., Nov. 10, 1939
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 34+00, access road to Middle Branch Regulating Dam, Belchertown, Mass., Jun. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead towards end of contract on Dam 3, access road to Middle Branch Regulating Dam, Belchertown, Mass., Jun. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 198+50, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 15+50, access road to Middle Branch Regulating Dam, Belchertown, Mass., Jun. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 15+50, access road to Middle Branch Regulating Dam, Belchertown, Mass., Jun. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back towards end of contract, access road to Middle Branch Regulating Dam, Belchertown, Mass., Jun. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 34+50, access road to Middle Branch Regulating Dam, Belchertown, Mass., Jun. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 114+00, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 5, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 35+75, Blue Meadow Road, Belchertown, Mass., Jun. 14, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 24+00, Blue Meadow Road, Belchertown, Mass., Jun. 14, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 14+50, Blue Meadow Road, Belchertown, Mass., Jun. 14, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 33+00, Blue Meadow Road, Belchertown, Mass., Jun. 14, 1940
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view of Shaft 11, looking easterly, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 11, looking northerly, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, progress panorama, outlet channel, looking southeast, diversion tunnel, Belchertown, Mass., Sep. 11, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, progress panorama of downstream cofferdam, looking west, diversion tunnel, Belchertown, Mass., Sep. 11, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, upstream cofferdam, looking west, diversion tunnel, Belchertown, Mass., Oct. 9, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, drilling operations in ledge at downstream portal of diversion tunnel stream control works, Belchertown, Mass., Dec. 28, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, approach channel, looking southwest, diversion tunnel, Belchertown, Mass., Jul. 11, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, progress panorama of upstream cofferdam, looking west, diversion tunnel, Belchertown, Mass., Sep. 11, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, upstream cofferdam and approach channel, looking northeast, diversion tunnel, Belchertown, Mass., Oct. 9, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, electric shovel in operation, diversion tunnel of stream control works, Belchertown, Mass., Mar. 25, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, experimental form used for constructing drill carriage to fit diversion tunnel, Belchertown, Mass., Dec. 1, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 11, looking southeasterly, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, looking down Shaft 11A, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northwest from near Sta. 13+50, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking north from west end of highway bridge, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southwesterly from 50 feet north of Sta. 7+50, east branch baffle, Hardwick, Mass., Aug. 7, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking upstream from culvert Sta. 3+78, east branch baffle, Hardwick, Mass., Jun. 25, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeast from Sta. 7+50, east branch baffle, Hardwick, Mass., Jun. 25, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeast from Sta. 6+50, east branch baffle, Hardwick, Mass., Oct. 8, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeast from near Sta. 13+30, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 71, WPA Sewer Construction, Holden, 4-A line, Holden, open cesspool at Sta. 4+50, showing sewage flowing out on ground, Holden Sewer, Holden, Mass., Apr. 2, 1941
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 113+00, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 41+50, Blue Meadow Road, Belchertown, Mass., Jun. 28, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 125+95, 11A road at left, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, drag used for mixing tar in place, East Branch access road, Belchertown, Mass., Jul. 18, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 130+00 at entrance, East Branch access road, Belchertown, Mass., Sep. 10, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 3+25 on Shaft 11A access road, Belchertown, Mass., Sep. 16, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 4+50 on Shaft 11A access road, Belchertown, Mass., Sep. 16, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 3+25 on Shaft 11A access road, Belchertown, Mass., Sep. 16, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 116+75, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 122+00, East Branch access road, Belchertown, Mass., Sep. 19, 1940
contains
Contract No. 107, Quabbin Hill Recreation Buildings and Road, Ware, looking westerly at public toilet building, showing stone work, staging, and slate roof, Ware, Mass., Dec. 13, 1940
contains
Contract No. 108, Utility Wharves, Quabbin Reservoir, Ware, panorama of anchorage basin, looking westerly from Sta. 0+00, 50 ft. left, Ware, Mass., Nov. 25, 1940
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, riprap on Ware River east of Boston and Maine Railroad trestle, Shaft 8, Barre, Mass., Mar. 6, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete lining, Shaft 6, Rutland, Mass., Mar. 6, 1930
contains
Contract No. 108, Utility Wharves, Quabbin Reservoir, Ware, panorama of anchorage basin, looking northerly from Sta. 0+00, 50 ft. left, Ware, Mass., Nov. 25, 1940
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, rodmen screeding concrete immediately after placing, Sta. 377+00, Shaft 5, Rutland, Mass., Nov. 4, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, finished tunnel concrete bottom of Shaft 6 looking west, Rutland, Mass., May 6, 1930
contains
Contract No. 108, Utility Wharves, Quabbin Reservoir, Ware, panorama of anchorage basin, looking northwesterly from Sta. 0+00, 50 ft. left, Ware, Mass., Nov. 25, 1940
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, looking along Access Road towards Shaft 10, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, tunnel vent at Sta. 1228+21, Quabbin Aqueduct, Hardwick, Mass., Aug. 1, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 9, looking southeasterly, Quabbin Aqueduct, Barre, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, upper intake, Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Aug. 1, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, looking east at Sta. 1314+94 showing forms for circular section, Quabbin Aqueduct, Hardwick, Mass., May 22, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, looking west at Sta. 1312+86, Quabbin Aqueduct, Hardwick, Mass., May 9, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, extension on shovel used for grading at Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Jun. 7, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, looking east at permanent timbering, Sta. 929+18, east heading of Shaft 10, Quabbin Aqueduct, Hardwick, Mass., May 24, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, arch and sidewall forms in east heading of Shaft 10, Quabbin Aqueduct, Hardwick, Mass., May 24, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 10, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, shaft enclosure, looking east, Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Mar. 1, 1935
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Ivar and Linda Maki, Holden, Rutland-Holden Sewer Line, Holden, Mass., Mar. 31, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking down channel from Sta. 16+00, looking north, middle-east channel, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking south at bridge at Sta. 10+00, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from bridge at Sta. 10+00, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 37, middle-east channel, Hardwick, Mass., May 20, 1936
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, left bank, Sta. 0+50, dike borrow area No. 7, shovel cut "G", Belchertown, Mass., Sep. 10, 1934
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, dike borrow area no. 7, shovel cut "G", end of cut, Sta. 1+45, Belchertown, Mass., Sep. 10, 1934
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, intake channel at Shaft 12, looking northwesterly, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Fred C. and Lucy Allen, Holden, Rutland-Holden Sewer Line, Holden, Mass., Mar. 31, 1936
contains
Contract No. 70, WPA Sewer Construction, Rutland, relocation of 6 in. water pipe around manhole 8B, plumb bob on center of manhole 8B, Maple Avenue, Rutland Sewer, Rutland, Mass., Oct. 9, 1940
contains
Contract No. 70, WPA Sewer Construction, Rutland, "C" line, looking back from Sta. 32+75, 15 feet left, Rutland Sewer, Rutland, Mass., Oct. 24, 1940
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking southerly showing finished grading of area south of engineer's office, headhouse at Shaft 4, Southborough, Mass., May 22, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking southerly showing completed grading operations, headhouse at Shaft 4, Southborough, Mass., May 22, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking southeasterly showing completed grading over road of tunnel spoil, headhouse at Shaft 4, Southborough, Mass., May 22, 1941
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, looking east into Shaft 6, Rutland, Mass., Oct. 25, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 483+15, Shaft 6 east, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, heading through Shaft 8 to 7, Barre, Mass., Feb. 12, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, aggregate piles, Shaft 5, Rutland, Mass., May 5, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant from spoil bank, Shaft 7, Rutland, Mass., Dec. 3, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete form sills and trim template, Shaft 6, Sta. 495+50+/-, Rutland, Mass., May 6, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 6 to Shaft 7, engineering force, Rutland, Mass., Oct. 25, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, heading through, Shaft 5 to 4, engineering force of Shaft 4, Rutland, Mass., Jan. 20, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, graded invert ready for concrete with tracks placed to one side for concrete cars, Sta. 378+50, Shaft 5, Rutland, Mass., Nov. 4, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, contractors' camp, Shaft 5, Rutland, Mass., Sep. 30, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, aggregate with crushers in rear, Shaft 7, Rutland, Mass., Mar. 6, 1930
contains
Contract No. 60, Access Roads to Shaft 12, Quabbin Aqueduct, Hardwick and Greenwich, right slope, showing storm damage, looking ahead from near Sta. 20+00, Greenwich and Hardwick, Mass., Sep. 28, 1938
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, boxed in and canvas caped 11 ft. and 6 in. pipe sections, cold weather protection, Natick, Mass., Oct. 27, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, canvas covers over 11 ft. and 6 in. pipe sections for cold weather protection, Lock Joint Pipe Co., Natick, Mass., Oct. 27, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, view of a Lock Joint trailer holding two 11 ft. 6 in. cages, Natick, Mass., Nov. 10, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, view of north part of shop where specials are fabricated, Natick, Mass., Nov. 10, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, showing steam plant for heating 60 in. pipe sections, also canvas caps for cold weather protection on 60 in. pipe sections, Lock Joint Pipe Co., Natick, Mass., Oct. 27, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, railroad locomotive boiler being used to supply heat for cold weather protection of pipe sections, Natick, Mass., Oct. 27, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, showing canvas covers and caps on 12 ft. 6 in. pipe sections for cold weather protection, Southborough, Mass., Oct. 27, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, view showing welding of rings, bell and spigot ring fabrication plant, Natick, Mass., Nov. 10, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, looking east showing view of storage yard, picture taken from top of concrete mixer, Natick, Mass., Nov. 10, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, winding of wire cage on steel cylinder for beveled pipe (showing beveled end on right), Natick, Mass., Oct. 16, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, tipping pipe sections with gantry crane, Southborough, Mass., Oct. 27, 1939
contains
Contract No. 105, Lightning Protection for Buildings, Barre, Belchertown, Hardwick, Marlborough, Rutland, Southborough, Weston, West Boylston, looking easterly at chlorine storage building at Norumbega Reservoir showing general view of air terminals and down cables, Weston, Mass., Jul. 11, 1941
contains
Contract No. 105, Lightning Protection for Buildings, Barre, Belchertown, Hardwick, Marlborough, Rutland, Southborough, Weston, West Boylston, looking westerly at southeasterly corner of chlorine storage building at Norumbega Reservoir showing down cable and fasteners, Weston, Mass., Jul. 11, 1941
contains
Contract No. 105, Lightning Protection for Buildings, Barre, Belchertown, Hardwick, Marlborough, Rutland, Southborough, Weston, West Boylston, looking easterly at chlorine storage building at Norumbega Reservoir showing general view of air terminals, Weston, Mass., Jul. 11, 1941
contains
Contract No. 105, Lightning Protection for Buildings, Barre, Belchertown, Hardwick, Marlborough, Rutland, Southborough, Weston, West Boylston, general view of ground rod, air terminals, and miscellaneous connections and fasteners used on Contract 105, Weston, Mass., Jul. 11, 1941
contains
Contract No. 105, Lightning Protection for Buildings, Barre, Belchertown, Hardwick, Marlborough, Rutland, Southborough, Weston, West Boylston, looking south at headhouse at Shaft 4 showing general view of air terminals on roof and chimney, Southborough, Mass., Jul. 18, 1941
contains
Contract No. 105, Lightning Protection for Buildings, Barre, Belchertown, Hardwick, Marlborough, Rutland, Southborough, Weston, West Boylston, general view of ground rod, air terminals and miscellaneous connections and fasteners used on Contract 105, Weston, Mass., Jul. 11, 1941
contains
Contract No. 105, Lightning Protection for Buildings, Barre, Belchertown, Hardwick, Marlborough, Rutland, Southborough, Weston, West Boylston, looking southwest at northwest corner of headhouse at Shaft 4 showing trenching operations for ground cable and ground rods, Southborough, Mass., Jul. 18, 1941
contains
Contract No. 105, Lightning Protection for Buildings, Barre, Belchertown, Hardwick, Marlborough, Rutland, Southborough, Weston, West Boylston, looking southeasterly at northerly side of chlorine storage building at Norumbega Reservoir showing connection from down cables to vent pipe, Weston, Mass., Jul. 11, 1941
contains
Contract No. 105, Lightning Protection for Buildings, Barre, Belchertown, Hardwick, Marlborough, Rutland, Southborough, Weston, West Boylston, looking easterly showing air terminal an fasteners on west side of chimney of chlorine storage building at Norumbega Reservoir, Weston, Mass., Jul. 11, 1941
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead on access road to East Branch Regulating Dam from end of pavement on Shaft 12 access road, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead towards Sta. 132+00, access road to East Branch Regulating Dam, Belchertown, Mass., May 21, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 113+00, East Branch access road, Belchertown, Mass., Jul. 18, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back towards Sta. 130+, East Branch access road, Belchertown, Mass., Jul. 15, 1940
contains
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress panorama, Shaft 8, stone wing wall and south bank, Barre, Mass., Jul. 2, 1930
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 172+00, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 27, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 41+50, Blue Meadow Road, Belchertown, Mass., Jun. 14, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 114+25, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 27, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 119+00, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 27, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, drag for mixing tar surface in use near Sta. 36+, access road to Middle Branch Regulating Dam, Belchertown, Mass., Jun. 28, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead towards Sta. 132, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 27, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 33+00, Blue Meadow Road, Belchertown, Mass., Jun. 28, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 33+00, Blue Meadow Road, Belchertown, Mass., Jun. 14, 1940
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Asnebumskit Brook culvert, looking downstream, Rutland-Holden Sewer, Holden, Mass., Oct. 10, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, upstream portal, diversion tunnel of stream control works, Belchertown, Mass., Jun. 14, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, excavation for river diversion, approach channel, stream control works, Belchertown, Mass., May 23, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, crusher plant at diversion tunnel, Belchertown, Mass., Jul. 11, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, finished concrete, diversion tunnel, looking downstream from intake portal, Belchertown, Mass., Feb. 5, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, tunnel forms for diversion tunnel, stream control works, Belchertown, Mass., Oct. 14, 1932
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, ledge excavation, looking southeast from Sta. 315+70, Rutland-Holden Sewer, Holden, Mass., Nov. 8, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, tunnel forms for diversion tunnel, stream control works, Belchertown, Mass., Oct. 14, 1932
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking east from highway intersection, east branch baffle, Hardwick, Mass., Dec. 4, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking east at quarry, east branch baffle, Hardwick, Mass., Feb. 10, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeast from Sta. 8+00, east branch baffle, Hardwick, Mass., Nov. 18, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, south baffle looking southerly from Sta. 0+00, east branch baffle, Hardwick, Mass., Nov. 18, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking easterly at south quarry, east branch baffle, Hardwick, Mass., Feb. 10, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northwest from near Sta. 11, east branch baffle, Hardwick, Mass., Dec. 4, 1936
contains
Contract No. 56, Administration Buildings, Main Dam, Belchertown, piping over boilers, looking northerly in boiler room, Main Building, Belchertown, Mass., Jul. 5, 1938
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, drag for mixing tar surface in use near Sta. 36+, access road to Middle Branch Regulating Dam, Belchertown, Mass., Jun. 28, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from intersection with Hardwick Road, East Branch access road, Belchertown, Mass., Jul. 18, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, shovel excavating near Sta. 0+25, Blue Meadow Road, Belchertown, Mass., Jun. 14, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 201+75, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 27, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 159+50, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 27, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta.14+50, Blue Meadow Road, Belchertown, Mass., Jun. 28, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 184+50, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 27, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking westerly at Sta. 0+25, Blue Meadow Road, Belchertown, Mass., Jun. 28, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, drag used for mixing tar in place, East Branch access road, Belchertown, Mass., Jul. 18, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back towards Sta. 130+75, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 27, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 4+00, Blue Meadow Road, Belchertown, Mass., Jun. 28, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 157+10, access road to East Branch Regulating Dam, Belchertown, Mass., Jun. 27, 1940
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking back from Sta. 33+00, Blue Meadow Road, Belchertown, Mass., Sep. 19, 1945
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 35+75, Blue Meadow Road, Belchertown, Mass., Sep. 19, 1945
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead on access road to East Branch Dam from end of pavement on Shaft 12 access road, Belchertown, Mass., Sep. 19, 1945
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 15+50, access road to Middle Branch Regulating Dam, Belchertown, Mass., Sep. 19, 1945
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead towards Sta. 152+00, access road to East Branch Regulating Dam, Belchertown, Mass., Sep. 19, 1945
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead toward end of contract on Dam 3, access road to Middle Branch Regulating Dam1, Belchertown, Mass., Sep. 19, 1945
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead from Sta. 34+50 to Middle Branch Regulating Dam, Belchertown, Mass., Sep. 19, 1945
contains
Contract No. 106, Improvement of Access Roads, Middle and East Branch Regulating Dams, and Quabbin Reservoir Area, Hardwick, Petersham, New Salem, Belchertown, looking ahead towards Sta. 132+00, access road to East Branch Regulating Dam, Belchertown, Mass., Sep. 19, 1945
contains
Contract No. 108, Utility Wharves, Quabbin Reservoir, Ware, excavation and forms for retaining wall, looking westerly from wing wall of culvert on road through borrow pit, Sta. 15+25, Ware, Mass., Oct. 3, 1940
contains
Contract No. 108, Utility Wharves, Quabbin Reservoir, Ware, placing riprap at end of turning space, looking northerly from wing wall of culvert on road through borrow pit, Sta. 15+25, Ware, Mass., Oct. 3, 1940
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking west in Quabbin Aqueduct at Sta. 723+97 on south wall, west of the Ware River Intake, Barre, Mass., Oct. 7, 1937
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 723+43 on the north wall, west of the Ware River Intake, Barre, Mass., Oct. 7, 1937
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 726+50 on the north wall, west of the Ware River Intake, Barre, Mass., Oct. 7, 1937
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 726+50 and 71 on the north side, west of the Ware River Intake, Barre, Mass., Apr. 16, 1936
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete placed ready for screeding, Sta. 377+50, Shaft 5, Rutland, Mass., Nov. 4, 1930
contains
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, photo no. 2, south abutment of intake works, Shaft 8, Barre, Mass., Sep. 30, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 721+36, west of the Ware River Intake, Barre, Mass., Oct. 7, 1937
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 722+28 on north side, west of Ware River Intake, Barre, Mass., Apr. 16, 1936
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 721+36, west of Ware River Intake, Barre, Mass., Apr. 16, 1936
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, general view of approach channel and plant, diversion tunnel, Belchertown, Mass., Jul. 11, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material, inlet channel, stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, ledge surface uncovered at portal location, diversion tunnel, Belchertown, Mass., Oct. 9, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 9, looking easterly, Quabbin Aqueduct, Barre, Mass., May 13, 1935
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, geologic formation in rocks taken from diversion tunnel of stream control works, Belchertown, Mass., May 10, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., May 10, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, drilling operations in ledge at downstream portal of diversion tunnel, stream control works, Belchertown, Mass., Dec. 28, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, heading and drill carriages at Sta. 17+21, diversion tunnel, stream control works, Belchertown, Mass., Feb. 16, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, cement shed and aggremeter at diversion tunnel, Belchertown, Mass., Jul. 11, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, excavation of outlet channel, looking southeast, Belchertown, Mass., Nov. 23, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, outlet channel, looking east, Belchertown, Mass., Nov. 23, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 9, looking northeasterly, Quabbin Aqueduct, Barre, Mass., May 13, 1935
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, south baffle looking southerly from Sta. 1+20, east branch baffle, Hardwick, Mass., Nov. 18, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, south baffle, looking northerly from Sta. 6+30, east branch baffle, Hardwick, Mass., Nov. 18, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking south at river bed from near headwall of culvert, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southwest from Sta. 7+60, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, beginning of stone fill at the east branch baffle, looking south, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 71, WPA Sewer Construction, Holden, Main Street, south side, looking westerly from manhole 8B, Holden Sewer, Holden, Mass., Dec. 28, 1939
contains
Contract No. 109, Radio System Installation, Ware, Belchertown, Pelham, Barre, Clinton, Southborough, trestle and transmission line, looking back from Sta. 3+70, Wachusett Reservoir, Clinton, Mass., Jan. 8, 1941
contains
Contract No. 109, Radio System Installation, Ware, Belchertown, Pelham, Barre, Clinton, Southborough, looking easterly at radio mast at Wachusett Reservoir, Clinton, Mass., Jan. 8, 1941
contains
Contract No. 109, Radio System Installation, Ware, Belchertown, Pelham, Barre, Clinton, Southborough, looking back from Sta. 0+80, showing completed trestle, Wachusett Reservoir, Clinton, Mass., Jan. 8, 1941
contains
Contract No. 109, Radio System Installation, Ware, Belchertown, Pelham, Barre, Clinton, Southborough, transmitter in the radio room of the Spa Building, Wachusett Reservoir, Clinton, Mass., Sep. 10, 1941
contains
Contract No. 109, Radio System Installation, Ware, Belchertown, Pelham, Barre, Clinton, Southborough, receiver in the radio room of the Spa Building, Wachusett Reservoir, Clinton, Mass., Sep. 10, 1941
contains
Contract No. 109, Radio System Installation, Ware, Belchertown, Pelham, Barre, Clinton, Southborough, looking easterly at radio mast at Wachusett Reservoir, Clinton, Mass., Sep. 10, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, view showing graded area between building and channel, headhouse at Shaft 4, Southborough, Mass., May 15, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, view showing grading on berm on west side of channel, headhouse at Shaft 4, Southborough, Mass., May 15, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, view showing grading operations between building and channel, headhouse at Shaft 4, Southborough, Mass., May 15, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, view showing graded area between building and needle valve chamber, headhouse at Shaft 4, Southborough, Mass., May 15, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, view showing fertilizing east of building, headhouse at Shaft 4, Southborough, Mass., May 15, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, view showing grading of area along access road west of engineer's office, headhouse at Shaft 4, Southborough, Mass., May 15, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking westerly showing completed grading operations, headhouse at Shaft 4, Southborough, Mass., May 22, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking southeasterly showing sub-grade of traffic circle and roadway, headhouse at Shaft 4, Southborough, Mass., May 22, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking southeasterly showing completed grading operations, headhouse at Shaft 4, Southborough, Mass., May 22, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking southwesterly showing rebuilt access road at Sta. 53+00, Section 1, Southborough, Mass., May 16, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking westerly from Sta. 77+50 showing rebuilt access road, Section 1, Southborough, Mass., May 16, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking westerly from Sta. 64+50 showing rebuilt access road, Section 1, Southborough, Mass., May 16, 1941
contains
Contract No. 130, Grading, Loaming, and Grassing Vicinity of Shaft 4, Pressure Aqueduct, Southborough, and Improvement of Access Roads to the Intake Works and at Norumbega Reservoir, Marlborough, Southborough, Weston, looking westerly from Sta. 73+00 showing rebuilt access road, Section 1, Southborough, Mass., May 16, 1941
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, wing wall at outlet channel at Shaft 1, West Boylston, Mass., Apr. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, loading muck cars in tunnel at Shaft 1, West Boylston, Mass., Apr. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 1 and outlet channel, West Boylston, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, turntable, east tunnel, Shaft 4, Rutland, Mass., Dec. 17, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, west heading, Shaft 4, Rutland, Mass., Dec. 17, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, pumping station, Shaft 4, Rutland, Mass., Dec. 17, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 1, West Boylston, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, channel outlet at Shaft 1, West Boylston, Mass., Dec. 19, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, channel outlet at Shaft 1, West Boylston, Mass., Dec. 19, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, interbedded quartzite and phyllite, north shore Wachusett Reservoir, Clinton, Mass., Mar. 19, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, loaded muck cars, bottom of Shaft 2, Holden, Mass., May 5, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, timbering, dynamite car and pump, Shaft 3, Sta. 217+00+/-, Holden, Mass., May 5, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, finished concrete, sidewalls and arch, Shaft 2, Sta. 168+00, Holden, Mass., Nov. 4, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, loading cars with dry concrete, bottom of Shaft 2, Holden, Mass., Nov. 4, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, car dumping into concrete mixer, Shaft 2, Sta. 161+50, Holden, Mass., Nov. 4, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, heading through Shaft 1 to 2 looking west, Sta. 29+34, West Boylston, Mass., Jun. 15, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, steel forms for concrete, Shaft 2, Sta. 164+00, Holden, Mass., Nov. 4, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, heading through Shaft 2 to 1 looking east, Sta. 29+34, Holden, Mass., Jun. 15, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, mucking machine (rear), Shaft 4, Rutland, Mass., Jan. 20, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, concrete mixer being assembled at Shaft 2, Holden, Mass., Dec. 1, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, south bank of outlet at Shaft 1, West Boylston, Mass., Nov. 3, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, timbering in tunnel, Shaft 3, Sta. 207+80+/-, Holden, Mass., May 5, 1930
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, loading cement into truck at Old Furnace, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation, Sta. 1146+50, east heading of Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Sep. 1, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1243+00, east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Apr. 21, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1139+28, east heading of Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Sep. 1, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1283+00, east heading, Shaft 12, Coldbrook-Swift Tunnel, Hardwick, Mass., Oct. 4, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, reinforcing rods for concreting timbered section at Sta. 1296+98 to 1295+79, east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Dec. 18, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, concrete in high roof at Sta. 1141+65+/-, east heading of Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Feb. 2, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, incline on concrete rig at Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, unloading cement at Old Furnace, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, mixers and chute at Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, intake portal at Shaft 12, Coldbrook-Swift Tunnel, Hardwick, Mass., May 21, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view of plant at Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Dec. 7, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, view of spoil pile at Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Feb. 8, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, arch forms for tunnel lining at Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 10, looking down Access Road, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, progress panorama of upstream cofferdam, looking east, diversion tunnel, Belchertown, Mass., Sep. 11, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, shaft enclosure at Shaft 12, looking southwesterly, aggregate hopper at right, Quabbin Aqueduct, Hardwick, Mass., Mar. 1, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, ruins of crusher plant at Shaft 10, destroyed by fire July 23, 1934, Quabbin Aqueduct, Hardwick, Mass., Jul. 24, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, incline and concreting plant, west heading of Shaft 10, Quabbin Aqueduct, Hardwick, Mass., Nov. 28, 1934
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, contractors buildings, fill north of outlet channel, Belchertown, Mass., Nov. 23, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, progress panorama of downstream cofferdam, looking east, diversion tunnel, Belchertown, Mass., Sep. 11, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, section of bank over north portal of diversion tunnel showing material, Belchertown, Mass., Mar. 24, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, drill carriages used in diversion tunnel of stream control works, Belchertown, Mass., Mar. 24, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, extension on shovel used for grading at Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Jun. 7, 1935
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, approach channel and upstream cofferdam, Belchertown, Mass., Nov. 23, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, downstream cofferdam, looking northeast, Belchertown, Mass., Nov. 23, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 11, looking northwesterly, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 9, looking northerly, Quabbin Aqueduct, Barre, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, covering over Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Jan. 9, 1935
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking west at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking southeast at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, downstream portal with drill carriages in place for drilling bench, diversion tunnel of stream control works, Belchertown, Mass., May 2, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southwesterly at north end of culvert, east branch baffle, Hardwick, Mass., Aug. 7, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, intake channel at Shaft 12, looking westerly, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at bridge at Sta. 10+00, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking south at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking east at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 71, WPA Sewer Construction, Holden, 4-A line, Holden, sewage coming out of ground at Sta. 4+90, Holden Sewer, Holden, Mass., Apr. 2, 1941
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, bulldozer pushing up fire, Enfield, Mass., Mar. 1, 1939
contains
Contract No. 61, Clearing West Branch, Quabbin Reservoir, Belchertown, Pelham, Shutesbury, New Salem, Ware (including in areas of former towns of Enfield and Prescott), burning brush in the west branch, looking northerly from near Aldrich Bridge, Enfield, Mass., Jun. 2, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking westerly from Ware Road towards Enfield, Enfield, Mass., Mar. 1, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking northerly towards town hall from hill opposite Howe's Store, Enfield, Mass., Mar. 1, 1939
contains
Contract No. 61, Clearing West Branch, Quabbin Reservoir, Belchertown, Pelham, Shutesbury, New Salem, Ware (including in areas of former towns of Enfield and Prescott), looking northerly towards Enfield, Enfield, Mass., Mar. 1, 1939
contains
Contract No. 61, Clearing West Branch, Quabbin Reservoir, Belchertown, Pelham, Shutesbury, New Salem, Ware (including in areas of former towns of Enfield and Prescott), looking southwesterly at Enfield from rear of Enfield Office, Enfield, Mass., Feb. 27, 1939
contains
Contract No. 61, Clearing West Branch, Quabbin Reservoir, Belchertown, Pelham, Shutesbury, New Salem, Ware (including in areas of former towns of Enfield and Prescott), looking northwesterly at Enfield from rear of Enfield Office, Enfield, Mass., Feb. 27, 1939
contains
Contract No. 61, Clearing West Branch, Quabbin Reservoir, Belchertown, Pelham, Shutesbury, New Salem, Ware (including in areas of former towns of Enfield and Prescott), looking westerly at Enfield from rear of Enfield Office, Enfield, Mass., Feb. 27, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, bulldozer pushing stump to fire, Enfield, Mass., Mar. 1, 1939
contains
Contract No. 61, Clearing West Branch, Quabbin Reservoir, Belchertown, Pelham, Shutesbury, New Salem, Ware (including in areas of former towns of Enfield and Prescott), showing size of tree pushed into fire, Quabbin Reservoir, Mass., Jan. 26, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, tree stumps near outlet of Greenwich Lake, Enfield and Ware, Mass., Mar. 29, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, tree stump near site of Segur house, Enfield and Ware, Mass., Mar. 29, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, tree stumps near Barlow property, Enfield and Ware, Mass., Mar. 29, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking northerly up valley from headhouse at Shaft 12, Enfield, Mass., Sep. 14, 1939
contains
Contract No. 63, Clearing Central Portion of Middle Branch, Quabbin Reservoir, New Salem, Petersham, Hardwick, bulldozer pushing brush into fire near Walker Place in Greenwich, Enfield, Mass., Mar. 29, 1939
contains
Contract No. 63, Clearing Central Portion of Middle Branch, Quabbin Reservoir, New Salem, Petersham, Hardwick, burning brush in Greenwich, Enfield, Mass., Mar. 29, 1939
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, bottom of Shaft 2, Holden, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, camp at Shaft 2, Holden, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 1 and outlet channel, West Boylston, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, headframe at Shaft 2, Holden, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, filter bed and chlorinator house at Shaft 1, West Boylston, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, bottom of shaft, Shaft 4, Rutland, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, muck car in tunnel at Shaft 2, Holden, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, concrete gun and mixer, Shaft 2, Sta. 162+00, Holden, Mass., Nov. 4, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, stripped form on jumbo, Shaft 2, Sta. 166+00, Holden, Mass., Nov. 4, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, heading through Shaft 4 to 5, Rutland, Mass., Jan. 20, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, filter plant, Shaft 2, Holden, Mass., Sep. 30, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 4, Sta. 284+20, Rutland, Mass., Aug. 27, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, outlets in outlet shaft lining, Shaft 1, West Boylston, Mass., May 5, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, finished tunnel concrete, bottom of Shaft 2, looking west, final work of laying invert in background, Holden, Mass., Feb. 2, 1931
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, transition section Shaft 1 looking west, Sta. 26+24+/-, West Boylston, Mass., Jun. 15, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, M.D.W.S. bench mark and shaft marker, bottom of Shaft 1, West Boylston, Mass., Feb. 2, 1931
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, car lifter, Shaft 3, Holden, Mass., May 5, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, guard rail on shaft cover and grading around Shaft 2, Holden, Mass., Aug. 31, 1931
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, cut by dragline for crushers, Shaft 7, Rutland, Mass., Mar. 6, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, dragline and crusher, Shaft 5, Rutland, Mass., May 5, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Ware River Intake Works, Shaft 8, Barre, Mass., Aug. 19, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, bulkhead in tunnel west of Shaft 8, Sta. 742+02, west side, Barre, Mass., Jan. 12, 1931
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, dragline and muck pile, Shaft 5, Rutland, Mass., May 5, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, heading through, Shaft 5 to 4, Rutland, Mass., Jan. 20, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 724+48 on the north and Sta. 724+50 on the south side, west of the Ware River Intake, Barre, Mass., Apr. 16, 1936
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, bulkhead in tunnel west of Shaft 8, Sta. 742+02, west side, Barre, Mass., Jan. 12, 1931
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking west in Quabbin Aqueduct at Sta. 723+97 on the south side, west of the Ware River Intake, Barre, Mass., Apr. 16, 1936
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 723+10 on the north side, west of the Ware River Intake, Barre, Mass., Apr. 16, 1936
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, bulkhead in tunnel west of Shaft 8, Sta. 742+02, east side, Barre, Mass., Jan. 12, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, Quabbin Aqueduct, looking east at Sta. 1318+44, Hardwick, Mass., Dec. 14, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, ruins of crusher plant at Shaft 11, destroyed by fire Jan. 2, 1934, Quabbin Aqueduct, Hardwick, Mass., Jan. 5, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, placing invert at Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1242+80, east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Apr. 21, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, washing plant at Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1111+30, east heading of Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Sep. 1, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, ruins of crusher plant at Shaft 11 destroyed by fire Jan. 2, 1934, Quabbin Aqueduct, Hardwick, Mass., Jan. 5, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, drilling rig for vent hole between Shafts 11 and 12, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, ruins of crusher plant at Shaft 10, destroyed by fire, July 23, 1934, Quabbin Aqueduct, Hardwick, Mass., Jul. 24, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, ruins of crusher plant at Shaft 10, destroyed by fire July 23, 1934, Quabbin Aqueduct, Hardwick, Mass., Jul. 24, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, mixer and weighing plant at Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Dec. 7, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, dragline and crusher plant at Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Martin Trulson property, looking south at Sta. 441+75, Rutland-Holden Sewer, Holden, Mass., Apr. 27, 1934
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, excavating sewer pipe trench at Sta. 35+00, looking north, Rutland-Holden Sewer, Holden, Mass., Nov. 8, 1933
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, laying 12 in. pipe in ledge, looking northwest from near manhole 9, Rutland-Holden Sewer, Holden, Mass., Oct. 10, 1933
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, fill and roadway crossing at Quinapoxet pipe, looking northerly, Rutland-Holden Sewer, Rutland, Mass., Sep. 6, 1934
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Ivar and Linda Maki, Holden, Rutland-Holden Sewer Line, Holden, Mass., Mar. 31, 1936
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Asnebumskit Brook fill, looking westerly, Rutland-Holden Sewer, Holden, Mass., Sep. 6, 1934
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, earth excavation above ledge, looking northwest from Sta. 315+70, Rutland-Holden Sewer, Holden, Mass., Nov. 8, 1933
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, refilling sewer pipe trench, looking south from Sta. 39+00, Rutland-Holden Sewer, Holden, Mass., Nov. 8, 1933
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, general view from Sta. 0+00, shovel cut "F", dike borrow area no. 6C, Belchertown, Mass., Oct. 5, 1934
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, laying 12 in. pipe in ledge at Sta. 40+00, looking southeasterly, Rutland-Holden Sewer, Holden, Mass., Oct. 10, 1933
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, measuring station "A", installing float well, Rutland-Holden Sewer, Holden, Mass., Sep. 6, 1934
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, concrete placing plant, diversion tunnel of stream control works, Belchertown, Mass., Aug. 2, 1932
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeast from Sta. 8+00, east branch baffle, Hardwick, Mass., Oct. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, general view of quarry, looking easterly, east branch baffle, Hardwick, Mass., Oct. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, headwall of culvert at east branch baffle, looking southeast, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northwest from Sta. 19+80, east branch baffle, Hardwick, Mass., Dec. 4, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northwest from Sta. 19+80, east branch baffle, Hardwick, Mass., Oct. 21, 1936
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from Sta. 12+25, Rutland Sewer, Rutland, Mass., Jan. 21, 1941
contains
Contract No. 71, WPA Sewer Construction, Holden, Main Street, looking ahead from near manhole 6B4-31, showing backfill on line of sidewalk, Holden Sewer, Holden, Mass., Jan. 9, 1941
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, fabricating machine for reinforcing cages, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, partially completed bell and spigot ring shop, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, partially completed hydraulic test apparatus, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, steel framework for steel shop, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, structure for crusher plant at gravel pit, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, welding tables for forms for concrete pipe, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, structure for conveyors to storage piles, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, fabricating machine for reinforcing cages, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, fabricating machine for reinforcing cages, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, shaping plates for forms for concrete pipe, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, concrete mixer and cement storage hopper, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, partially completed plate welding tables, Natick, Mass., Mar. 23, 1939
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, waterfall, Shaft 2 east, Sta. 103+10, Holden, Mass., Aug. 9, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, quartz vein, Shaft 2 west, Sta. 133+60, Holden, Mass., Aug. 9, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 4, Sta. 316+20, Rutland, Mass., Aug. 27, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, concrete plant, Shaft 1, West Boylston, Mass., Jul. 29, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, pegmatite vein, vertical, Shaft 2 east, Sta. 83+25, Holden, Mass., Aug. 9, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, vertical banding, Shaft 2 east, Sta. 98+60, Holden, Mass., Aug. 9, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 4, Sta. 323+40, Rutland, Mass., Aug. 27, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, spoil bank, Shaft 4, Rutland, Mass., Sep. 30, 1929
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, fabrication plant for steel 7 in. pipes, looking northerly, Natick, Mass., Aug. 8, 1939
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, contractors buildings, Shaft 4, Rutland, Mass., Sep. 30, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, filter plant, Shaft 2, Holden, Mass., Sep. 30, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Worcester Phyllite, north shore of Wachusett Reservoir, Clinton, Mass., Mar. 19, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, steel lining, Shaft 1, West Boylston, Mass., Dec. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, spoil bank, Shaft 2, Holden, Mass., Sep. 30, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, bronze guard chains, railing, etc., bottom of Shaft 1, West Boylston, Mass., Feb. 2, 1931
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, dragline cuts in muck pile, Shaft 2, Holden, Mass., Dec. 1, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, water coming through top of tunnel between Shafts 2 and 3, Sta. 190+00+/-, Holden, Mass., May 5, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, jumbo drill carriage used at Shafts 2 and 4, Holden, Mass., Jun. 15, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, mucking machine, Shaft 4, Rutland, Mass., Jan. 20, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, timbering in tunnel, Shaft 3, Sta. 209+00+/-, Holden, Mass., May 5, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, transition section, Shaft 1, Sta. 26+24+/-, looking west, West Boylston, Mass., Feb. 2, 1931
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, transition section Shaft 1, looking east, Sta. 26+24, West Boylston, Mass., Jun. 15, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Nov. 14, 1928
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, intake structure showing stop log columns on weir, Shaft 12, Hardwick, Mass., Sep. 24, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, head frame (center), compressor house (right), Shaft 12, Hardwick, Mass., Nov. 25, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1300+60, east heading, Shaft 12, Coldbrook-Swift Tunnel, Hardwick, Mass., Oct. 4, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1249+50, east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Apr. 21, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1248+80, east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Apr. 21, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1243+00, east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Apr. 21, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1248+60, east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Apr. 21, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1137+22, east heading of Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Sep. 1, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1118+60, east heading of Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Sep. 1, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1104+30, east heading of Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Sep. 1, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, permanent timbering at Sta. 881+28 to 880+76, looking east, west heading, Shaft 9, Coldbrook-Swift Tunnel, Barre, Mass., Feb. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, heading through at Sta. 1230+08, looking east from east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Jun. 14, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, lower intake channel, Shaft 12, looking west, Quabbin Lake in background, Hardwick, Mass., Nov. 25, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, headframe, crusher plant and dragline at Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, incline and train, concrete rig, Quabbin Aqueduct, Shaft 11, Hardwick, Mass., Nov. 9, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1088+60, east heading of Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Sep. 1, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, looking easterly at headframe and plant at Shaft 10, Quabbin Aqueduct, Hardwick, Mass., May 24, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, batching plant at Shaft 10, Quabbin Aqueduct, Hardwick, Mass., Nov. 28, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, screening plant at Shaft 10, Quabbin Aqueduct, Hardwick, Mass., Nov. 28, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, looking east near Sta. 1313+79, Quabbin Aqueduct, Hardwick, Mass., May 9, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, plant at Shaft 10, looking northwesterly, Quabbin Aqueduct, Hardwick, Mass., May 24, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, finished arch and sidewalls and arch forms, west heading of Shaft 10, looking east, Quabbin Aqueduct, Hardwick, Mass., Nov. 28, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, pouring sidewalls in west heading of Shaft 10, Quabbin Aqueduct, Hardwick, Mass., Nov. 28, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, placing invert in west heading of Shaft 10, Quabbin Aqueduct, Hardwick, Mass., Nov. 28, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 9, looking southerly, Quabbin Aqueduct, Barre, Mass., May 13, 1935
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northwest from Sta. 6+50, east branch baffle, Hardwick, Mass., Oct. 8, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, quarry tunnel and type of dynamite used, east branch baffle, Hardwick, Mass., Sep. 16, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, quarry face and tunnel, east branch baffle, Hardwick, Mass., Oct. 8, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking north on Access Road taking from near corner 11, south baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking south from near corner 11 on Access Road taking, south baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking ahead from manhole 4A, Rutland Sewer, Rutland, Mass., Jan. 26, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from Sta. 15+90, Rutland Sewer, Rutland, Mass., May 23, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking ahead from manhole 1A, Rutland Sewer, Rutland, Mass., May 23, 1941
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Worcester Brook fill, subgrade, looking west from Sta. 127+50, Rutland-Holden Sewer, Holden, Mass., Nov. 8, 1933
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Martin Trulson property, looking northwest near Sta. 438, Rutland-Holden Sewer, Holden, Mass., Apr. 27, 1934
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, outlets for Venturi meters, outlet channel of diversion tunnel, Belchertown, Mass., Feb. 5, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, outlet channel of diversion tunnel, stream control works, Belchertown, Mass., Oct. 24, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, drill carriages used in diversion tunnel of stream control works, Belchertown, Mass., Mar. 24, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, downstream cofferdam, looking southeast, Belchertown, Mass., Nov. 23, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, downstream portal, drill carriages in place for drilling bench, diversion tunnel of stream control works, Belchertown, Mass., May 2, 1932
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, laying 16 in. pipe, looking west from near Sta. 267+40, Rutland-Holden Sewer, Holden, Mass., Oct. 10, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Worcester Brook fill, subgrade, looking east from Sta. 124+75, Rutland-Holden Sewer, Holden, Mass., Nov. 8, 1933
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, fill south of Newell Rd., looking northwesterly, Rutland-Holden Sewer, Holden, Mass., Oct. 10, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, finished concrete, diversion tunnel, looking downstream from intake portal, Belchertown, Mass., Feb. 5, 1933
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, Walker quarry, looking southwesterly along line of Photo 51-145, Hardwick, Mass., Jun. 3, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, Walker quarry, looking southwest along line of Photo 51-145, Hardwick, Mass., Jun. 3, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, ledge outcrop near south quarry, looking northeast, Hardwick, Mass., Apr. 21, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, ledge outcrop near south quarry, looking northeast, Hardwick, Mass., Apr. 21, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, Walker quarry, showing edge of reservoir clearing, Hardwick, Mass., Jun. 3, 1937
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from Sta. 10+10, Rutland Sewer, Rutland, Mass., Jan. 9, 1941
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 8, library, high level distribution reservoir, Weston, Mass., Jul. 19, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 7, hall, high level distribution reservoir, Weston, Mass., Jul. 19, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking southeasterly down the valley from Thurston nursery, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking southeasterly down valley from near Greenwich Lake, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking southerly down valley from Thurston nursery, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, moving part of Thayer house from Greenwich out of valley, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking southeasterly down Quabbin Lake, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking northerly across Greenwich Lake, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking northeasterly across Smiths Village, Enfield, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, treedozer in operation, knocking down a pine tree, Enfield, Mass., Dec. 21, 1938
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking northerly up valley from road up Quabbin Hill, Enfield, Mass., Feb. 27, 1939
contains
Contract No. 72, Clearing a Portion of the Site of Quabbin Reservoir on the Upper Middle and East Branches of the Swift River, Quabbin Reservoir, New Salem, Petersham and Hardwick, fire near New Salem Station, looking southwesterly, New Salem, Mass., Jun. 6, 1939
contains
Contract No. 72, Clearing a Portion of the Site of Quabbin Reservoir on the Upper Middle and East Branches of the Swift River, Quabbin Reservoir, New Salem, Petersham and Hardwick, fire on west side of Mount L, looking southwesterly from Route 21, Greenwich, Mass., May 23, 1939
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, close up for detail of west end of form, Shaft 1, West Boylston, Mass., Aug. 9, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, jointing, Shaft 2 east, Sta. 80+60, Holden, Mass., Aug. 9, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, jointing, Shaft 2 west, Sta.147+50, Holden, Mass., Aug. 9, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, heading through Shaft 2 to 3, engineering force, Holden, Mass., Mar. 11, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, water in Shaft 3 from 2, Holden, Mass., Mar. 11, 1930
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 4, Sta. 311+60, Rutland, Mass., Aug. 27, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, rock formation, Shaft 2, Holden, Mass., Jul. 29, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, panorama picture 5, Shaft 2, Holden, Mass., Jul. 29, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, contractors buildings, Shaft 2, Holden, Mass., Sep. 30, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, lining looking west, Shaft 1, West Boylston, Mass., Aug. 9, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 4, Sta. 305+85, Rutland, Mass., Aug. 27, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, heading with mucker, Shaft 2 west, Holden, Mass., Aug. 9, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, site for spoil bank, south of river, Barre, Mass., Aug. 12, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 637+06, Shaft 7 west, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 604+25, Shaft 7 east, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 503+50, Shaft 6 east, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, electric winch operates dragline, crushers with aggregate piles in rear, Shaft 7, Rutland, Mass., Mar. 6, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant looking west, Shaft 7, Rutland, Mass., Jan. 17, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant looking north, Shaft 7, Rutland, Mass., Jan. 17, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant, Shaft 7, northeast from spoil bank, Rutland, Mass., Jan. 17, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, portable conveyor, Shaft 6 west, Rutland, Mass., Jan. 17, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, tunnel lining equipment, Shaft 6 west, Rutland, Mass., Jan. 17, 1930
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, progress panorama, Shaft 9, looking northeast, compressor house on right, Barre, Mass., Jul. 10, 1931
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, group making inspection trip through Quabbin Aqueduct, looking easterly just east of Shaft 6, Rutland, Mass., Dec. 8, 1938
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 724+70 and 71 on the north and south sides respectively, west of the Ware River Intake, Barre, Mass., Apr. 16, 1936
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 722+28 on north wall, west of the Ware River Intake, Barre, Mass., Oct. 7, 1937
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, 48 in. conduit in diversion tunnel of stream control works, Belchertown, Mass., Sep. 8, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, forms for wing walls, approach channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, outlet channel, stream control works, Belchertown, Mass., Jun. 14, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., May 10, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, general view of approach channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, ledge uncovered at downstream portal, Belchertown, Mass., Nov. 23, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, approach channel and upstream portal at stream control works, Belchertown, Mass., Apr. 28, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, modified drift deposits, percolation study of main dam foundation material at inlet channel of stream control works, Belchertown, Mass., May 10, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, approach channel and upstream portal of stream control works, Belchertown, Mass., Apr. 28, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, rock formation in diversion tunnel of stream control works, near Sta. 19+80, Belchertown, Mass., May 2, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, downstream cofferdam, looking north, Belchertown, Mass., Nov. 23, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, upstream cofferdam, looking north, Belchertown, Mass., Nov. 23, 1931
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking west at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking south at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking north from west side of highway bridge, east branch baffle, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking upstream from culvert site, Sta. 1+96, Hardwick, Mass., May 26, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking upstream from near Sta. 3+78, culvert site, Hardwick, Mass., May 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking west at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, site of east branch baffle, looking southeast from Sta. 13+00, Hardwick, Mass., Jun. 25, 1936
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from near Sta. 17+25, Rutland Sewer, Rutland, Mass., Feb. 26, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking ahead from Sta. 9+75 toward manhole 4A, Rutland Sewer, Rutland, Mass., Jan. 21, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from manhole 3A, Rutland Sewer, Rutland, Mass., May 23, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from manhole 2A, Rutland Sewer, Rutland, Mass., May 23, 1941
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 4, dining room, high level distribution reservoir, Weston, Mass., Jul. 19, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 5, dining room, high level distribution reservoir, Weston, Mass., Jul. 19, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 6, hall, high level distribution reservoir, Weston, Mass., Jul. 19, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, welding tables and forming rolls, Natick, Mass., Apr. 6, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, concrete plant, Natick, Mass., Apr. 6, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, base rings for forms for concrete pipe, Natick, Mass., Apr. 6, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, steel shop with cranes in place, Natick, Mass., Apr. 6, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, roller, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, winding reinforcements, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, roller carriage, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, winding reinforcements, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, closure seam well, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, bell and spigot fabrication, Lock Joint plant, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, automatic welder, plates on plate carriage, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, shears and plate welding shop, Natick, Mass., Apr. 6, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, shears for cutting steel plate, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, forming machine for bell and spigot rings, Natick, Mass., Apr. 6, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, bell and spigot ring shaping machine, Natick, Mass., Apr. 6, 1939
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant, Shaft 7, Rutland, Mass., Dec. 3, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, spoil bank and contractors buildings, Shaft 6, Rutland, Mass., Sep. 30, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, finished grading, Shaft 6 west looking east, Rutland, Mass., Dec. 3, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, grading in process, Shaft 7 east looking east, Rutland, Mass., Dec. 3, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking west into Shaft 7, Rutland, Mass., Oct. 25, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, rock formation, Shaft 8, Sta. 724+80, Barre, Mass., Jul. 29, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, rock formation, Shaft 8, Sta. 724+50, Barre, Mass., Jul. 29, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, completed riprap for Boston and Albany Railroad, Shaft 8, Barre, Mass., Aug. 26, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, contractor's buildings from spoil bank, Shaft 5, Rutland, Mass., Sep. 30, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, spoil bank and contractors buildings, Shaft 7, Rutland, Mass., Sep. 30, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, riprap for Boston and Albany Railroad, Barre, Mass., Aug. 12, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, trestle for spoil bank on south of river, Barre, Mass., Aug. 12, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, steel forms for concrete, Shaft 6 west, Rutland, Mass., Jan. 17, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, results of fire in compressor room, Mar. 3, 1931, at Shaft 7, looking southwest, Rutland, Mass., Mar. 11, 1931
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, concrete plant northeast from top spoil bank, Shaft 7, Rutland, Mass., Jan. 17, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, water flow at Sta. 483+05+/-, piped and tinned, ready for concrete, Shaft 6, Rutland, Mass., May 6, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, stripped form on jumbo being moved ahead, Shaft 6, Sta. 501+25+/-, Rutland, Mass., May 6, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, cement house and aggregate piles, Shaft 5, Rutland, Mass., May 5, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, contractors' crew, Shaft 4, looking easterly from Shaft 5 to 4, Rutland, Mass., Jan. 20, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, stripping form, Shaft 6, Sta. 501+50+/-, Rutland, Mass., May 6, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, steel forms for concrete, Shaft 6 west, Rutland, Mass., Jan. 17, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, finished tunnel concrete, bottom Shaft 6 looking east, Rutland, Mass., May 6, 1930
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, percolation study of main dam foundation material, test pit at inlet channel of stream control works, Belchertown, Mass., May 10, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, downstream cofferdam from high bank west of river looking east, diversion tunnel, Belchertown, Mass., Oct. 9, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, bridge across Swift River and road leading from portal to downstream cofferdam, diversion tunnel, Belchertown, Mass., Oct. 9, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, excavation and cleaning ledge at portal location, looking northwest, diversion tunnel, Belchertown, Mass., Oct. 9, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, downstream cofferdam east of river, looking west, diversion tunnel, Belchertown, Mass., Oct. 9, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, section of bank over north portal of diversion tunnel showing material, Belchertown, Mass., Mar. 24, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, outlet channel, looking southeast from top of ledge above portal location, Belchertown, Mass., Oct. 9, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, excavation for shaft at diversion tunnel, Belchertown, Mass., Jul. 11, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, heading at Sta. 17+10, diversion tunnel of stream control works, Belchertown, Mass., Feb. 17, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, approach channel, stream control works, looking towards portal, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, mixer and forms for wing walls, approach channel of stream control works, Belchertown, Mass., Jul. 21, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, outlet channel, diversion tunnel of stream control works, Belchertown, Mass., Oct. 14, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, intake for diversion tunnel of stream control works, Belchertown, Mass., Oct. 14, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, aggregate and cement batching plant, upstream channel of stream control works, Belchertown, Mass., Sep. 8, 1932
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Newell Rd. culvert, Sta. 436+82, Rutland-Holden Sewer, Holden, Mass., Nov. 8, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, cofferdam at outlet channel of diversion tunnel, Belchertown, Mass., Jun. 14, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, piers at foot of shaft, diversion tunnel, looking downstream, Belchertown, Mass., Feb. 5, 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, placing invert, diversion tunnel of stream control works, Belchertown, Mass., Sep. 8, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, upstream portal of diversion tunnel, Belchertown, Mass., Jul. 11, 1932
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, intake shaft, stream control works, Belchertown, Mass., Jun. 14, 1933
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, outlet channel at Shaft 11A, looking north on east side of channel, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 47+00, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north from Shaft 11A along channel, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, outlet channel at Shaft 11A, looking north from shaft, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking southwest at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking south at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 37+00, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, view of left bank at Sta. 1+90, shovel cut "H", dike borrow area no. 10, Belchertown, Mass., Oct. 19, 1934
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, riprap on the south baffle, looking southerly from near Sta. 1+40, Hardwick, Mass., Dec. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking north along highway, east branch baffle, Hardwick, Mass., Dec. 4, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northerly at outlet of culvert, east branch baffle, Hardwick, Mass., Dec. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, ledge outcrop near main quarry, looking easterly, Hardwick, Mass., Apr. 21, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northwest from Sta. 14+00, east branch baffle, Hardwick, Mass., Nov. 18, 1936
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, view of cut in north face of shovel cut "F", excavated Jan. 27, 1939 at Sta. 1+20, 15 ft. right, depth 10 feet, Belchertown, Mass., Jan. 27, 1939
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, view of cut in north face of shovel cut "F", excavated Jan. 27, 1939 at Sta. 1+20, 15 ft. right, depth 10 feet, Belchertown, Mass., Jan. 27, 1939
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, view of cut in north face of shovel cut "F", excavated Jan. 27, 1939 at Sta. 1+20, 15 ft. right, depth 10 feet, Belchertown, Mass., Jan. 27, 1939
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, looking ahead at sheeted trench, Sta. 472+92 to Sta. 474+82, Rutland-Holden Sewer, Rutland, Mass., Sep. 6, 1934
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Martin Trulson property, looking southeast at Sta. 438+50, Rutland-Holden Sewer, Holden, Mass., Apr. 27, 1934
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at bridge, middle-east channel, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking south at bridge, middle-east channel, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, lower intake channel at Shaft 12, spoil on north side of channel, looking west, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, outlet channel at Shaft 11A, looking north at Sta. 8+60, Hardwick, Mass., May 20, 1936
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Eagle Lake fill, looking westerly, Rutland-Holden Sewer, Rutland, Mass., Sep. 6, 1934
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northwest from Sta. 13+50, east branch baffle, Hardwick, Mass., Oct. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, south baffle, looking northwest from Sta. 5+00, east branch baffle, Hardwick, Mass., Nov. 18, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking upstream from culvert Sta. 1+96, east branch baffle, Hardwick, Mass., Jun. 25, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeasterly at baffle site from hill near old schoolhouse, east branch baffle, Hardwick, Mass., Aug. 7, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking easterly at baffle from near highway intersection, east branch baffle, Hardwick, Mass., Dec. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northwest from Sta. 8+50, east branch baffle, Hardwick, Mass., Nov. 18, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northwest from Sta. 7+60, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking north from below highway bridge at end of culvert, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking south from Sta. 0+20, south baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeast from Sta. 13+50, east branch baffle, Hardwick, Mass., Oct. 21, 1936
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, tunneling under hydrant manhole 4A, Rutland Sewer, Rutland, Mass., Jan. 21, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from manhole 1C, Rutland Sewer, Rutland, Mass., May 23, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, "C" line, manhole 11C, sewer line under 6 in. water main on Pommagussett Road, Rutland Sewer, Rutland, Mass., Apr. 2, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, "C" line, at manhole 1J, looking ahead towards manhole 2 and Rutland High School, Rutland Sewer, Rutland, Mass., Apr. 2, 1941
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from near manhole 5A, Rutland Sewer, Rutland, Mass., May 23, 1941
contains
Contract No. 61, Clearing West Branch, Quabbin Reservoir, Belchertown, Pelham, Shutesbury, New Salem, Ware (including in areas of former towns of Enfield and Prescott), bulldozer pushing tree into fire, Quabbin Reservoir, Mass., Jan. 26, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, tree stumps near site of Church Cemetery, Enfield and Ware, Mass., Mar. 29, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, tree stump along Enfield-Ware Road, Enfield and Ware, Mass., Mar. 29, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking easterly across Quabbin Lake towards Shaft 12, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, tree stumps on knoll north of Enfield, Enfield and Ware, Mass., Mar. 29, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking southerly across Greenwich Common, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking northerly towards Greenwich Village, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking westerly at area cut by treedozer on east side of Greenwich Lake, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking southeasterly towards Shaft 12 from near Greenwich, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, looking northerly across Greenwich Cemetery, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 62, Clearing Lower Middle and East Branches, Quabbin Reservoir, Ware, New Salem, Petersham and Hardwick, burning brush on the east side of Quabbin Lake, Greenwich, Mass., Mar. 21, 1939
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, general view looking towards camp, West Boylston, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, heading in tunnel at Shaft 4, Rutland, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, general view of Shaft 2, Holden, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, finished concrete lining looking west, Shaft 1, West Boylston, Mass., Jul. 29, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, outlet channel showing stoplog piers, Shaft 1, West Boylston, Mass., Apr. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, outlet channel at Shaft 1, showing stoplog piers, West Boylston, Mass., Apr. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, settling basin at Shaft 2, Holden, Mass., Dec. 19, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, geologic formation in tunnel at Shaft 4, Rutland, Mass., Apr. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, geologic formation in tunnel at Shaft 2, Holden, Mass., Apr. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, panorama picture 4, Shaft 2, Holden, Mass., Jul. 29, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, property of Chadzynski near Shaft 2, Holden, Mass., Nov. 14, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, Shaft 1 and channel outlet, West Boylston, Mass., Dec. 19, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, car lifter, west tunnel, Shaft 4, Rutland, Mass., Dec. 17, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, filter beds at Shaft 2, Holden, Mass., Dec. 19, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 22, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, Rutland, Mass., Nov. 21, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 6, Rutland, Mass., Nov. 22, 1928
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, abandoned filter bed, Shaft 2, Holden, Mass., Aug. 31, 1931
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, abandoned filter bed, Shaft 2, Holden, Mass., Aug. 31, 1931
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Nov. 14, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 22, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 504+60, Shaft 6 east, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, head house foundation, Shaft 4, Rutland, Mass., Aug. 31, 1931
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, transition section, Shaft 1, Sta. 26+24+/-, looking east, West Boylston, Mass., Feb. 2, 1931
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 21, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 6, Rutland, Mass., Nov. 22, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, Rutland, Mass., Nov. 21, 1928
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 773+30, east heading of Shaft 9, Coldbrook-Swift Tunnel, Barre, Mass., Jan. 25, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 770+00, east heading, Shaft 9, Coldbrook-Swift Tunnel, Barre, Mass., Jan. 25, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, rock formation, south side of Shaft 12 between elevations 480-499, Hardwick, Mass., Aug. 7, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, holing through, east heading, Shafts 9 to 8, at Sta. 769+99, looking east, engineering force of Shaft 9, Barre, Mass., Jan. 25, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, progress panorama, Shaft 9, looking southwest, Barre, Mass., Jul. 10, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1250+10, east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Apr. 21, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, heading through Shafts 11 to 12 at Sta. 1230+08, engineering force of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Jun. 14, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, holing through, Shafts 9 to 8, at Sta. 769+99, looking west from west heading of Shaft 8, Barre, Mass., Jan. 25, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, heading through at Sta. 1230+08, looking west from west heading of Shaft 11, Quabbin Aqueduct, Hardwick, Mass., Jun. 14, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, contractors buildings, Shaft 9, Barre, Mass., Aug. 7, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, geologic formation at Sta. 1242+12, east heading of Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Apr. 21, 1933
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, mucking machine in operation test, Shaft 12, front view, Hardwick, Mass., Jan. 9, 1932
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, sinking shaft at Shaft 11A, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, view of plant at Shaft 11A, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, progress panorama, excavation at outlet channel, looking northwest, diversion tunnel, Belchertown, Mass., Sep. 11, 1931
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, upstream cofferdam, looking northeast, Belchertown, Mass., Nov. 23, 1931
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, concrete mixers at Shaft 10, Quabbin Aqueduct, Hardwick, Mass., Nov. 28, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 11, looking westerly, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, rock crushers at Shaft 10, Quabbin Aqueduct, Hardwick, Mass., Nov. 28, 1934
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, general view at Shaft 10, Quabbin Aqueduct, Hardwick, Mass., May 13, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, template for stop shutters at upper intake, Shaft 12, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 20, Coldbrook-Swift Tunnel, Barre, Hardwick, Greenwich, covering over Shaft 12, Quabbin Aqueduct, Hardwick, Mass., Jan. 9, 1935
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, general view from Sta. 0+00, shovel cut "H", dike borrow area no. 10, Belchertown, Mass., Oct. 19, 1934
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, general view from Sta. -0+40, shovel cut "C", dike borrow area no. 6A, Belchertown, Mass., Oct. 5, 1934
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking down channel from Sta. 35+40, middle-east channel, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking down channel from Sta. 57+00+/-, middle-east channel, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking up channel from Sta. 1+50 on road, middle-east channel, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 28+00, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 15, middle-east channel, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from bridge, middle-east channel, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 28+50, middle-east channel, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking down channel from Sta. 52+80, middle-east channel, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking northwest at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 34+00, middle-east channel, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, large quarry, showing 10 feet overburden, looking easterly, Hardwick, Mass., Jun. 3, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, large quarry, showing zero feet overburden, looking southeast, Hardwick, Mass., Jun. 3, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northeast at quarries from Sta. 4+80, 138 feet left on relocated road, Hardwick, Mass., Apr. 21, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeast from near Sta. 12+50, east branch baffle, Hardwick, Mass., Dec. 4, 1936
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, general view, looking easterly, Natick, Mass., Feb. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, general view, looking west, Lock Joint Pipe Co. Plant, Natick, Mass., Feb. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, contractors storehouse, Lock Joint Pipe Co. Plant, Natick, Mass., Feb. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, looking towards Speen Street from the Lock Joint Pipe Co. Plant, Natick, Mass., Feb. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, contractors office, Lock Joint Pipe Co. Plant, Natick, Mass., Feb. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, gantry train footings for track, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, forms for concrete pipe after fabricating, Natick, Mass., Mar. 23, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, general view, looking westerly, Natick, Mass., Feb. 24, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, cylinders ready for concrete, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, unconcreted pipe on base ring, Lock Joint, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, placing concrete in cylindrical forms, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, base rings and gantry crane, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, yard for storage of 7 in. pipe, looking southeasterly, Natick, Mass., Aug. 8, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, general view looking west, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, Lock Joint at north entrance looking east, Natick, Mass., Jun. 2, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, concrete mixer, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, steam jackets for curing finished pipe, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, stored pipe for Section 7, Contract 73, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, wetting down pipe, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, Lock Joint at south entrance looking east, Natick, Mass., Jun. 2, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, base rings and gantry crane, Lock Joint, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, loading pipe on trailers, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, welding rings on cylinders, Natick, Mass., May 29, 1939
contains
Contract No. 85, Manufacture and Delivery of Precast Concrete Steel Cylinder Pipe, Southborough, Framingham, Wayland, Natick, Weston, stored pipe, Natick, Mass., May 29, 1939
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 534+70, Shaft 6 west, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, heading, Shaft 6 east, Sta. 483+00, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Sta. 630+53, Shaft 7, Rutland, Mass., Aug. 2, 1929
contains
Contract No. 14, East Portion, Wachusett-Coldbrook Tunnel, West Boylston, Holden, Rutland, crusher and aggregate piles, Shaft 2, Holden, Mass., Dec. 1, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 6, Rutland, Mass., Nov. 22, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, site of Shaft 8, Barre, Mass., Jan. 5, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, dam at site of Shaft 8, Barre, Mass., Jan. 5, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Apr. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 5, Rutland, Mass., Apr. 2, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 6, Rutland, Mass., Nov. 22, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, east heading, Barre, Mass., May 3, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 7, Rutland, Mass., Nov. 21, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, Shaft 8, Barre, Mass., Nov. 22, 1928
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, weir for measuring flow of water from pumps at bottom of Shaft 8, Barre, Mass., Aug. 19, 1930
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 723+43 on the north side, west of the Ware River Intake Works, Barre, Mass., Apr. 16, 1936
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking east in Quabbin Aqueduct at Sta. 723+10 on the north wall, west of the Ware River Intake, Barre, Mass., Oct. 7, 1937
contains
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress panorama, Shaft 8, dam and head house foundation, Barre, Mass., Jul. 2, 1930
contains
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress panorama 3, photo no. 1, Shaft 8, Barre, Mass., Aug. 28, 1929
contains
Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, progress panorama 3, photo no. 3, Shaft 8, Barre, Mass., Aug. 28, 1929
contains
Contract No. 17, West Portion, Wachusett-Coldbrook Tunnel, Rutland, Oakham, Barre, looking easterly in Quabbin Aqueduct west of Shaft 6, Rutland, Mass., Dec. 8, 1938
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Newell Rd. culvert, Sta. 436+82, Rutland-Holden Sewer, Holden, Mass., Nov. 8, 1933
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Martin Trulson property, looking north near Sta. 436, Rutland-Holden Sewer, Holden, Mass., Apr. 27, 1934
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Martin Trulson property, looking north at Sta. 432, Rutland-Holden Sewer, Holden, Mass., Apr. 27, 1934
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking downstream from Sta. 55, middle-east channel, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking northerly along center line of channel at Shaft 11A, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Fred C. and Lucy Allen, Holden, Rutland-Holder Sewer Line, Holden, Mass., Mar. 31, 1936
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Fred C. and Lucy Allen, Holden, Rutland-Holden Sewer Line, Holden, Mass., Mar. 31, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, spoil on south side of lower intake channel at Shaft 12, looking west, Hardwick, Mass., May 20, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking down channel from Sta. 47+00, middle-east channel, Hardwick, Mass., Dec. 19, 1935
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, right bank, Sta. 1+00, dike borrow area no. 7, shovel cut "G", Belchertown, Mass., Sep. 10, 1934
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, looking east at Sta. 42+50, Veterans Hospital branch, Rutland-Holden Sewer, Rutland, Mass., Apr. 27, 1934
contains
Contract No. 39, Trunk Line Sewer, Rutland, Holden, Martin Trulson property, looking south near Sta. 425, Rutland-Holden Sewer, Holden, Mass., Apr. 27, 1934
contains
Contract No. 45, Exploration by Shovel Cuts of Borrow Areas for Main Dam and Dike, Belchertown, Enfield, Ware, view of right bank at end of cut, Sta. 2+20, shovel cut "H", dike borrow area no. 10, Belchertown, Mass., Oct. 19, 1934
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking east at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southwest from 50 feet left of Sta. 7+40, east branch baffle, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, east branch baffle, looking southeast from Sta. 13+00, Hardwick, Mass., May 20, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, site of east branch baffle, looking northwest from Sta. 13+00, Hardwick, Mass., May 26, 1936
contains
Contract No. 49, Excavating Diversion Channels, Site of Quabbin Reservoir, Dana, Hardwick, Greenwich, looking north at area north of Shaft 11A, Hardwick, Mass., Aug. 26, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northwesterly at baffle site from Sta. 7+60, east branch baffle, Hardwick, Mass., Aug. 7, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, diverting river into culvert, looking southerly, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southerly at culvert and river bed, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southeast from Sta. 7+60, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking southerly at culvert, east branch baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northeast from near corner 4 along Access Road, south baffle, Hardwick, Mass., Aug. 21, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, looking northerly at borrow area and quarry from south side of Hardwick Road near watertank, east branch baffle, Hardwick, Mass., Jul. 8, 1936
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, quarry location, looking east below Greenwich Village, Hardwick, Mass., Jun. 21, 1937
contains
Contract No. 51, East Branch Baffle, Site of Quabbin Reservoir, Greenwich, Hardwick, small quarry showing 4 feet overburden, looking east, Hardwick, Mass., Jun. 3, 1937
contains
Contract No. 70, WPA Sewer Construction, Rutland, relocation of 6 in. water pipe around manhole 8B, shovel on center of manhole 8B, Maple Avenue, Rutland Sewer, Rutland, Mass., Oct. 10, 1940
contains
Contract No. 70, WPA Sewer Construction, Rutland, line "A", Main Street, looking back from manhole 4A, Rutland Sewer, Rutland, Mass., Feb. 26, 1941
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 11, living room, high level distribution reservoir, Weston, Mass., Jul. 19, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 12, pantry, high level distribution reservoir, Weston, Mass., Jul. 19, 1939
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, 80 feet left of Sta. 13+00+/- looking southeast showing excavation dam 8, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, basin 2, looking north from 20 feet left of Sta. 8+10, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north from Sta. 0+75 showing basin 3 site, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, Sta. 6+75, looking southeast showing site of road and end site of dam 8, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking northeast from Sta. 4+75 showing site of road, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north from Sta. 15+75 showing site of dam 7, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north showing site of open channel, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, spoil area looking northeast from Wyoming Path, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, site of dam 6, looking north from Sta. 19+15, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north along line of 16 inch cast iron drain and 38 inch steel pipe from Sta. 4+50+/-, enlargement of Fells Reservoir, Stoneham, Mass., Apr. 25, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking west from Sta. 23+40+/- showing borrow pit, west side of basin 2, enlargement of Fells Reservoir, Stoneham, Mass., Jun. 8, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, spoil area west of basin 1 looking south from high service road, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, borrow area on Bent Road looking north from by Bent Road, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, borrow area, looking east from Bent Road, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, basin 1, Fells Reservoir looking southeast, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, cutting for power line looking northwest, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, basin 1, Fells Reservoir looking south, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, concrete covering for 38 feet steel main at dam 10, looking north, enlargement of Fells Reservoir, Stoneham, Mass., Apr. 25, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking southeasterly at borrow pit east of Bent Road, enlargement of Fells Reservoir, Stoneham, Mass., Jun. 8, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking west from Sta. 2+30+/- showing cutoff wall, dam 10, enlargement of Fells Reservoir, Stoneham, Mass., Jun. 8, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking south from Sta. 25+75 showing borrow area, basin 2, enlargement of Fells Reservoir, Stoneham, Mass., Jun. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, excavation in basin 2, looking north from Sta. 10+50, enlargement of Fells Reservoir, Stoneham, Mass., Jul. 26, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north from Sta. 2+40 showing basin 3, enlargement of Fells Reservoir, Stoneham, Mass., Aug. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north from Sta. 2+80 showing basin 3, enlargement of Fells Reservoir, Stoneham, Mass., Jul. 26, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, stripping, basin 2, 175 feet south of gatehouse looking east, enlargement of Fells Reservoir, Stoneham, Mass., Jul. 26, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking south from road Sta. 8+60 showing gatehouse Access Road, enlargement of Fells Reservoir, Stoneham, Mass., Jun. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking east from Sta. 0+60+/- showing cutoff wall and valve chamber foundation, enlargement of Fells Reservoir, Stoneham, Mass., Jun. 8, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking south from Sta. 19+10 showing ledge excavation, enlargement of Fells Reservoir, Stoneham, Mass., Apr. 25, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north from 100 feet right of Sta. 1+40 showing 16 inch drain, 60 inch, 38 inch, and 36 inch pipe, enlargement of Fells Reservoir, Stoneham, Mass., Jun. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking northwest from Sta. 15+40 showing stripping operations in basin 2, enlargement of Fells Reservoir, Stoneham, Mass., Aug. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking northwest from Sta. 19+40 showing basin 3, enlargement of Fells Reservoir, Stoneham, Mass., Aug. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking northwest from Sta. 10+50 showing basin 2, enlargement of Fells Reservoir, Stoneham, Mass., Jun. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking northeast from Sta. 10+00 showing basin 2, enlargement of Fells Reservoir, Stoneham, Mass., Aug. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking southwest showing gunnited ledge left of Sta. 8+00, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, washing down ledge in basin 2, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north from Sta. 19+00 showing basin 2, enlargement of Fells Reservoir, Stoneham, Mass., Aug. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, drainage channel in basin 2, left of Sta. 18+00, looking north, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking northwest from floor of basin 2 showing excavation for channel between basins 1 and 2, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, basin 1, looking north from Sta. 0+70, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, dividing wall in basin 1 exposed at low water, looking northwest, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, exposed core wall, open channel site, basin 1 to basin 2, looking west, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, excavation for open channel between basins 1 and 2 looking northwest, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north from Sta. 0+90 showing basin 3 and mat over main, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking northeast from Sta. 8+00 showing basin 2, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north from Sta. 19+45 showing basin 2, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking east from Sta. 8+00 showing basin 10, enlargement of Fells Reservoir, Stoneham, Mass., Aug. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north from Sta. 1+00 showing basin 3, enlargement of Fells Reservoir, Stoneham, Mass., Aug. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking northeast from Sta. 5+00 showing Access Road, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 13, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking east at site of open channel between basins 1 and 2, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 27, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, basin 2, looking northwest from Sta. 19+45, enlargement of Fells Reservoir, Stoneham, Mass., Sep. 27, 1940
contains
Contract No. 111, Winsor Dam Outlet Works Superstructure, Belchertown, east wall, patent hammered base stone, looking northwesterly, outlet works superstructure, Belchertown, Mass., Dec. 10, 1940
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, general view of location of underground cable line from Outlet Works to Administration Building, looking northerly, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 7, 1946
contains
Contract No. 149, Furnishing and Delivering a Waterwheel, Generator, Switchgear, Transformer, Substation for the Winsor Dam Power Plant, Belchertown, view of generator housing on cribbing, operating floor interior of Outlet Works, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Jan. 13, 1947
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, looking northerly at substation in rear of Outlet Works, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Sep. 2, 1947
contains
Contract No. 84, Superstructure (Head House) , Shaft 4 of Southborough Tunnel, Pressure Aqueduct, Section 2, Southborough, view showing bronze window grille in position after correction by silver soldering, headhouse at Shaft 4, Southborough, Mass., Jul. 11, 1941
contains
Contract No. 47, Service Building and Head House at Shaft 12, Quabbin Aqueduct, Greenwich, Rutland, view of service building Shaft 12, looking northeasterly, Rutland, Mass., Aug. 9, 1945
contains
Contract No. 47, Service Building and Head House at Shaft 12, Quabbin Aqueduct, Greenwich, Rutland, view of headhouse Shaft 12, looking westerly, Rutland, Mass., Aug. 9, 1945
contains
Contract No. 149, Furnishing and Delivering a Waterwheel, Generator, Switchgear, Transformer, Substation for the Winsor Dam Power Plant, Belchertown, view of generator bridge and miscellaneous parts disassembled from generator, interior of Outlet Works, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Jan. 13, 1947
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, Winsor Dam Outlet superstructure, looking westerly, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Sep. 2, 1947
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view down through floor of Outlet Works showing draft tube ring, in northeasterly corner of basement, on which turbine is to be placed, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 7, 1946
contains
Contract No. 25, Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, scattered glass in front of outlet building at Shaft 1, West Boylston, Mass., Jan. 26, 1938
contains
Contract No. 25, Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, broken window in outlet, Shaft 1, West Boylston, Mass., Jan. 26, 1938
contains
Contract No. 112, Spillway at Shaft 2 of Quabbin Aqueduct, Holden, looking down from top of spoil pile, Sta. 1+60, 90 feet right, spillway at Shaft 2, Holden, Mass., Oct. 28, 1940
contains
Contract No. 84, Superstructure (Head House) , Shaft 4 of Southborough Tunnel, Pressure Aqueduct, Section 2, Southborough, looking easterly showing west and south sides of building, headhouse at Shaft 4, Southborough, Mass., May 29, 1941
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, upstream portal, diversion tunnel of stream control works, Belchertown, Mass., ca. 1933
contains
Contract No. 30, Stream Control Works at Main Dam, Swift River Reservoir, Belchertown, Enfield, Ware, upstream portal, diversion tunnel of stream control works, Belchertown, Mass., ca. 1933
contains
Contract No. 80, High Level Distribution Reservoir, Weston, rock excavation, dam 2, looking north from 100 feet right of Sta. 880+00+/- on aqueduct center line, high level distribution reservoir, Weston, Mass., Dec. 15, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, looking east from center line of dam 1, northeast corner of gate house, showing Schenck's Pond intake, high level distribution reservoir, Weston, Mass., Mar. 13, 1940
contains
Contract No. 80, High Level Distribution Reservoir, Weston, looking south from Sta. 881+80, left side, showing overburden and bedrock, high level distribution reservoir, Weston, Mass., Apr. 16, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, present Fells Reservoir, basin 1, looking east from 150 feet east of gatehouse, beach marks site of open channel, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, present Fells Reservoir, basin 1, looking northwest from 150 feet east of gatehouse, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, present Fells Reservoir, basin 1, looking west from 150 feet east of gatehouse, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 80, High Level Distribution Reservoir, Weston, view of transit mixer (2 yd. truck), Maffei Sand and Gravel Company, Natick, high level distribution reservoir, Weston, Mass., Nov. 2, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, 20 feet left of Sta. 10+00, dam 1, looking northeast showing general conditions dam 1, high level distribution reservoir, Weston, Mass., Nov. 13, 1939
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view from floor of Outlet building showing top of existing concrete to be removed for relief valve connection to 48 in. line, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 8, 1946
contains
Contract No. 149, Furnishing and Delivering a Waterwheel, Generator, Switchgear, Transformer, Substation for the Winsor Dam Power Plant, Belchertown, view of 1500 KVA Niagara transformer (Erie Electric Co.) installed Oct. 21, 1945 at rear of Outlet Works, looking northeasterly, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Oct. 23, 1945
contains
Contract No. 149, Furnishing and Delivering a Waterwheel, Generator, Switchgear, Transformer, Substation for the Winsor Dam Power Plant, Belchertown, view of 1500 KVA Niagara transformer (Erie Electric Co.) installed Oct. 21, 1945 at rear of Outlet Works, looking easterly, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Oct. 22, 1945
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, general view of pole line previous to clearing from vicinity of pole #2, looking southerly, Outlet Works, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 7, 1946
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, interior view of south wall, 1st floor east, Administration Building, showing proposed location of control panel, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 8, 1946
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view of northeasterly corner in Outlet Works building showing location of generator, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 7, 1946
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, general view of pole line previous to clearing, looking southerly, Outlet Works, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 7, 1946
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view from basement floor of Outlet building showing side of existing reinforced concrete to be removed for relief valve connection to 48 in. line, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 7, 1946
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view of floor slab in northeasterly corner of Outlet Works showing generator location, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Jan. 8, 1947
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view of operating floor, Outlet Works building, showing switchgear location, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Jan. 8, 1947
contains
Contract No. 25, Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, broken window on easterly side of outlet building at Shaft 1, West Boylston, Mass., Jan. 26, 1938
contains
Contract No. 56, Administration Buildings, Main Dam, Belchertown, spiral staircase, first floor to basement, main building, administration buildings, Belchertown, Mass., Jun. 10, 1938
contains
Contract No. 107, Quabbin Hill Recreation Buildings and Road, Ware, looking westerly at utility building and tower, showing 6th floor observatory, radio mast, Quabbin Hill building, Ware, Mass., Feb. 10, 1941
contains
Contract No. 80, High Level Distribution Reservoir, Weston, looking east from Sta. 12+/-, dam 1, showing stock piles of impervious material, high level distribution reservoir, Weston, Mass., Apr. 23, 1940
contains
Contract No. 80, High Level Distribution Reservoir, Weston, looking east from Sta. 3+80, dam 3 to dam 4 Access Road, showing equipment in yard, high level distribution reservoir, Weston, Mass., May 29, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north along high service road showing its intersection with dam 10, sign on center line, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking north along line of 36 inch main from high service road, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, interior view of west wall, 1st floor east, of Administration Building, showing location of control panel, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Jan. 8, 1947
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view from floor of Outlet building showing concrete partially removed for relief valve connection to 48 in. line, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 25, 1946
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view from floor of Outlet building showing metal collar for pressure regulator connection, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Jul. 30, 1946
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, interior view of west wall, 1st floor east, of Administration Building, showing location of control panel, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Jan. 13, 1947
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view below operating floor in Outlet Works showing conduit entrance to switchgear panels, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Jan. 13, 1947
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, general view of New England Power Transmission Line showing location of pole #5, looking westerly, Outlet Works, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 7, 1946
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view of cable pull box in northeast corner of East Garage, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Jan. 13, 1947
contains
Contract No. 80, High Level Distribution Reservoir, Weston, 200 feet west of Sta. 27+/- on dam 1 looking southeast showing dam 1, swamp 3, and gatehouse location, high level distribution reservoir, Weston, Mass., Jan. 5, 1940
contains
Contract No. 80, High Level Distribution Reservoir, Weston, looking southwest from northeast corner of gatehouse, center line of dam 1, showing construction of twin aqueduct, high level distribution reservoir, Weston, Mass., Mar. 13, 1940
contains
Contract No. 80, High Level Distribution Reservoir, Weston, looking south from northeast corner of gatehouse, center line of dam 1, showing second pour in gatehouse, high level distribution reservoir, Weston, Mass., Mar. 13, 1940
contains
Contract No. 80, High Level Distribution Reservoir, Weston, showing left side of concrete wall, lower barrel of the twin aqueduct line, Sta. 883+60, high level distribution reservoir, Weston, Mass., Aug. 2, 1940
contains
Contract No. 80, High Level Distribution Reservoir, Weston, Olive F. Thornton Residence, photo no. 38, garage, high level distribution reservoir, Weston, Mass., Jul. 20, 1939
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, looking east showing excavation in northeast corner of basin 3, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 99, Enlargement of Fells High Level Distribution Reservoir, Stoneham, Malden, Melrose, present Fells Reservoir, basin 1, looking northeast from 150 feet east of gatehouse, enlargement of Fells Reservoir, Stoneham, Mass., Feb. 12, 1940
contains
Contract No. 80, High Level Distribution Reservoir, Weston, 20 feet left of Sta. 26+90, looking north showing concrete forms, dam 1, high level distribution reservoir, Weston, Mass., Oct. 2, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, 20 feet right of Sta. 25+00, looking south showing concrete forms, dam 1, high level distribution reservoir, Weston, Mass., Oct. 2, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, 20 feet left of Sta. 26+90, looking south showing concrete forms, dam 1, high level distribution reservoir, Weston, Mass., Oct. 2, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, view of transit mixer (4 yd. truck), Maffei Sand and Gravel Company, Natick, high level distribution reservoir, Weston, Mass., Nov. 2, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, view of aggremeter and cement hopper building, Maffei Sand and Gravel Company, Natick, high level distribution reservoir, Weston, Mass., Nov. 2, 1939
contains
Contract No. 80, High Level Distribution Reservoir, Weston, view of aggregate plant, Maffei Sand and Gravel Company, Natick, high level distribution reservoir, Weston, Mass., Nov. 2, 1939
contains
Contract No. 112, Spillway at Shaft 2 of Quabbin Aqueduct, Holden, pouring concrete, looking northwesterly from top of spoil pile, Sta. 1+60, 90 feet right, spillway channel at Shaft 2, Holden, Mass., Oct. 28, 1940
contains
Contract No. 80, High Level Distribution Reservoir, Weston, looking north from Sta. 12+/- , dam 1, showing pervious borrow area, high level distribution reservoir, Weston, Mass., Apr. 23, 1940
contains
Contract No. 111, Winsor Dam Outlet Works Superstructure, Belchertown, looking southerly at outlet works superstructure, showing shelter, concrete plant and contractor's office, outlet works superstructure, Belchertown, Mass., Dec. 18, 1940
contains
Contract No. 84, Superstructure (Head House) , Shaft 4 of Southborough Tunnel, Pressure Aqueduct, Section 2, Southborough, view showing bronze window grilles in position after correction by silver soldering, headhouse at Shaft 4, Southborough, Mass., Jul. 11, 1941
contains
Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view of remote control cable trench, rear of East Garage, looking westerly, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Jan. 13, 1947
contains
Contract No. 84, Superstructure (Head House) , Shaft 4 of Southborough Tunnel, Pressure Aqueduct, Section 2, Southborough, looking southeasterly showing bronze doors at entrance to headhouse, headhouse at Shaft 4, Southborough, Mass., Jul. 18, 1941
contains
Contract No. 56, Administration Buildings, Main Dam, Belchertown, 2 inch glazed tile, basement toilet, main building, Belchertown, Mass., May 12, 1938
contains
Contract No. 56, Administration Buildings, Main Dam, Belchertown, vault wall, washroom, toilet entrance, 2nd floor main administration building, Belchertown, Mass., Mar. 10, 1938
contains
Contract No. 56, Administration Buildings, Main Dam, Belchertown, grinding terrazzo, basement staircase, Main Building, Belchertown, Mass., Jun. 10, 1938
contains
Contract No. 56, Administration Buildings, Main Dam, Belchertown, spiral staircase, first floor to basement, Main Building, Belchertown, Mass., Jun. 10, 1938
contains
Contract No. 56, Administration Buildings, Main Dam, Belchertown, rear of boilers and flues, boiler room, main administration building, Belchertown, Mass., Mar. 10, 1938
contains
Contract No. 56, Administration Buildings, Main Dam, Belchertown, placing tile, second floor stair well, main administration building, Belchertown, Mass., Mar. 10, 1938
contains
Contract No. 21, Portion of Ware-Belchertown Highway, Ware and Belchertown, William R. and Sarah Stead, house, barn and chicken house, Plan No. S-2, Belchertown, Mass., Jul. 13, 1931
contains
Contract No. 21, Portion of Ware-Belchertown Highway, Ware and Belchertown, Frederick E. Lincoln, house, barn and shed, Plan No. S-2, Belchertown, Mass., Jul. 13, 1931
contains
Contract No. 21, Portion of Ware-Belchertown Highway, Ware and Belchertown, Joseph F. Dyer, house, barn and shed, Plan No. S-5, Ware, Mass., Jul. 13, 1931
contains
Contract No. 21, Portion of Ware-Belchertown Highway, Ware and Belchertown, finished concrete, east side of west abutment, new highway bridge, concrete form for west pier at right, Ware and Belchertown, Mass., Nov. 10, 1931
contains
Contract No. 21, Portion of Ware-Belchertown Highway, Ware and Belchertown, pile driver bridge, steel piling, cofferdam and concrete form for west pier, new highway bridge, Ware and Belchertown, Mass., Oct. 14, 1931
contains
Contract No. 21, Portion of Ware-Belchertown Highway, Ware and Belchertown, aggregate pile and tower (left), concrete mixer tower (right), West bank of Swift River, looking northeast, new highway bridge, Ware and Belchertown, Mass., Oct. 14, 1931
contains
Contract No. 21, Portion of Ware-Belchertown Highway, Ware and Belchertown, aggregate carriage, tower and pile, west bank of Swift River, new highway bridge, Ware and Belchertown, Mass., Oct. 14, 1931
contains
Contract No. 24, Superstructure, Ware River Intake Building, Shaft 8, Wachusett-Coldbrook Tunnel, Barre, Intake Building, front view, Shaft 8, Barre, Mass., Aug. 31, 1931
contains
Contract No. 25,Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, general view of Outlet superstructure, steel frame work, looking toward southwest corner, West Boylston, Mass., Nov. 3, 1930
contains
Contract No. 25,Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, general view of Outlet superstructure, steel frame work, looking toward southeast corner, Shaft 1, West Boylston, Mass., Nov. 3, 1930
contains
Contract No. 25,Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, tile work on inside of west wall of Outlet superstructure, Shaft 1, West Boylston, Mass., Nov. 3, 1930
contains
Contract No. 25,Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, interior view of Outlet Building, Shaft 1, West Boylston, Mass., Aug. 31, 1931
contains
Contract No. 25,Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, stone work on west wall of Outlet superstructure, Shaft 1, West Boylston, Mass., Nov. 3, 1930
contains
Contract No. 25,Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, stone work, southwest corner of Outlet superstructure, Shaft 1, West Boylston, Mass., Nov. 3, 1930
contains
Contract No. 25,Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, end of outlet channel and river channel at Shaft 1, West Boylston, Mass., Jan. 26, 1938
contains
Contract No. 25,Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, stone work on east side of Outlet Building, Shaft 1, West Boylston, Mass., Dec. 1, 1930
contains
Contract No. 26, Furnishing and Installing Power and Lightning Equipment, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, switch-board and Venturi Meter recorder, Outlet Building, Shaft 1, West Boylston, Mass., Aug. 31, 1931
contains
Contract No. 25,Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, rear view of Outlet Building, Shaft 1, West Boylston, Mass., Dec. 1, 1930
contains
Contract No. 26, Furnishing and Installing Power and Lightning Equipment, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, switch-board and Venturi Meter recorder, Outlet Building, Shaft 1, West Boylston, Mass., Aug. 31, 1931
contains
Contract No. 25,Superstructure, Wachusett Outlet Works Building, Shaft 1, Wachusett-Coldbrook Tunnel, West Boylston, exterior view of bronze door casing in Outlet Building, Shaft 1, West Boylston, Mass., Dec. 1, 1930
contains
Contract No. 43, Extension of Belchertown-Pelham Highway to New Salem Center, Shutesbury, New Salem (Franklin County), New Salem Center, road passing John Marshall property, new highway connection in background, New Salem, Mass., Mar. 19, 1935
contains
Contract No. 43, Extension of Belchertown-Pelham Highway to New Salem Center, Shutesbury, New Salem (Franklin County), New Salem Center, ditch through swamp westerly of John Marshall property, from new highway, New Salem, Mass., Mar. 19, 1935
contains
Contract No. 44, Extension of Belchertown-Pelham Highway, New Salem, Orange, culvert on middle branch, Swift River, Sta. 1045+50, New Salem, Mass., Jun. 6, 1934
contains
Contract No. 56, Administration Buildings, Main Dam, Belchertown, 8in. sewer line, looking southerly, showing manhole, Belchertown, Mass., Oct. 11, 1937